Browse
Search
Agenda 12-09-2025; 8-a - Minutes for November 6, 2025 Business Meeting and November 11, 2025 Work Session
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 12-09-2025 Business Meeting
>
Agenda 12-09-2025; 8-a - Minutes for November 6, 2025 Business Meeting and November 11, 2025 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:13:38 PM
Creation date
12/4/2025 3:17:48 PM
Metadata
Fields
Template:
BOCC
Date
12/9/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for December 9, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 12-09-2025 Business Meeting
ORD-2025-038-Fiscal year 2025-26 budget amendment #4
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-039-North Carolina Governor's Highway Safety Program
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-040-Award of bid for installation and replacement of booths at Solid Waste and recycling centers
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-041-Fiscal year 2025-26 budget amendment #5
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-042-Transit scheduling and dispatch software agreement approval and approval of budget amendment #5
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-107-Performance Agreement Between Orange County and Citel America
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
RES-2025-065-Motor Vehicle Property Tax Releases Refunds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-066-Property Tax Release Refund
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> 1 Slide #27 <br /> Septic Systems <br /> What We Proposed What We heard How We Responded Guiding Policy/Agency <br /> Individual Septic Concerns lots were too -Engineer evaluated Orange County Public In the event that <br /> Systems on each lot small to allow for representative lots Health Department—Rules any lot cannot <br /> septic systems throughout for Onsite Wastewater sustain adequate <br /> Reconnaissance community to Treatment and Dispersal septic soil, <br /> Soil and Site confirm septic Systems developer bears <br /> Evaluation systems fit risk of losing a <br /> Prepared by developable lot(s). <br /> Earthly Elements -Provided detailed 15A NCAC 18E- <br /> Soil Consulting on drawings showing Waste Water Treatment <br /> 03.14.2024 to how lots would be and Dispersal Systems <br /> confirm soil laid out <br /> suitability for <br /> septic <br /> F©X <br /> Rothschild <br /> 2 <br /> 3 Commissioner Fowler said that there have been a lot of concerns from residents about <br /> 4 the septic systems and runoff contaminating the creeks. She asked the applicant to speak to <br /> 5 those concerns. <br /> 6 David Barcal said he conducted a preliminary soils analysis for the site, and the majority <br /> 7 is labeled conventional soil (24-30 inches deep of usable soil), providing good filtration and <br /> 8 downward flow as opposed to upwards or outwards or lateral flow. He said no lots are platted <br /> 9 within riparian setbacks or wetlands. For marginal soils requiring drip systems, they would provide <br /> 10 pre-treatment with UV disinfection and media filters for better water quality. <br /> 11 Commissioner Fowler asked if all the septic systems could be put on conventional soil. <br /> 12 David Barcal said at least at a desktop level, they can fit a four-bedroom system for each <br /> 13 lot, all on conventional soils. <br /> 14 Commissioner Carter said she recalls from the packet that 10 acres of the property fall <br /> 15 under the marginal soil category. She asked if that is included in the lot sighting shown in the <br /> 16 proposal. <br /> 17 David Barcal said it could be 10 acres total, but there are only a few sites that have <br /> 18 marginal soil within the property lines of a lot. He said they would design the septic system in the <br /> 19 conventional soils and, if needed, would use the drip system for the repair field. He explained that <br /> 20 this would make repair field cycling possible. <br /> 21 Vice-Chair Hamilton asked for more information on the repair field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.