Orange County NC Website
E <br /> DocuSign Envelope ID:C8D9258E-OB18-4FBC-9A51-15AOE32Al2BA <br /> 28 <br /> CONTRACT NO.:45615VW <br /> VW-TRANSIT BUS PROGRAM <br /> Attachment B <br /> E <br /> Days of usage, <br /> Mileage, <br /> • Electricity usage(kW used charging,cost,number of Cycles per vehicle)as well j <br /> Lis kW per hour/per mile, <br /> • Training provided to drivers and maintenance staff, <br /> + Out of service days,and <br /> Maintenance costs(tires,inspections,batteries,air-filters,brakes,and/or other). <br /> D. )rinul Report Requirements <br /> A final project report will include a narrative sununary of the project or activity,project <br /> results(outputs and outcomes)including final emissions benefit calculations,and the <br /> successes and lessons learned for the entire project, <br /> F"or projects involving vehicle/engine/equipment replacement or repowcr the recipient <br /> must provide in the find report: <br /> a. Evidence of appropriate vehicle/engine/equipment scrappage.Complete and <br /> include NC DAQ Fort 001 Certificate of Destruction with required photographic <br /> evidence ofvehicle(s)destruction. <br /> b. Photographic evidence of now vehicle/engine/equipment purchased.Complete <br /> and include NC DAQ Fond 003 Certificate of Purchase with required <br /> photographic evidence of new veliicle(s). <br /> A template for the final project report will be made available by NC DEQ oil our <br /> webpage,lit[7s;1/dc�.iic. col�Ftiv-sLtticr€�ca�tlft�z �7s. <br /> I <br /> Page 13 of 26 <br />