Orange County NC Website
12 <br /> Federal Award Identification Number (FAIN): NC-2025-028 <br /> Award with Amendment Number: NC-2025-028-00 <br /> Award Name: Section 5307 ORANGE COUNTY Transit Capital and Operating <br /> Assistance, Burlington UZA <br /> Award Start Date: 4/10/2025 <br /> Original Award End Date: 3/30/2032 <br /> Current Award End Date: 3/30/2032 <br /> Award Executive Summary: Funding Fiscal Year Apportionment <br /> 2022....................... $98,000 <br /> 2016....................... $62,000 <br /> 2020....................... $133,787 <br /> This is an FHWA funds transferred to FTA Section 5307 funding application for Orange <br /> County, NC, in the amount of $192,000, representing an 80% federal share ($160,000) <br /> and a 20% local share ($32,000) of the total amount, AND an FFY20 Section 5307 <br /> funding application for Orange County, NC, in the amount of $267,574, representing a <br /> 50% federal share ($133,787) and a 50% local share ($133,787) of the total amount. <br /> These funds are apportioned to the Burlington UZAs. This application will utilize FHWA <br /> and Section 5307 funding from the urbanized areas in separate projects. <br /> The purpose of this award is to provide Orange County, NC, with capital and operating <br /> assistance funding for the transit system. The application scope of work includes the <br /> capital procurement of three (3) 20'-25' light transit vehicles utilizing FHWA funds <br /> transferred to FTA Section 5307 allocated to the Burlington UZA. <br /> STIP ID is TD-5155: Purchase of (1) 20'-25' transit vehicle, federal share: $62,000.00. <br /> This project is referenced in the STIP on page 97, and the referenced page is attached <br /> in Application Documents. <br /> STIP ID is TD-6721: Purchase of (2) 20'-25' transit vehicles, federal share: $98,000.00. <br /> This project is referenced in the STIP on page 100, and the referenced page is attached <br /> in Application Documents. <br /> AND <br /> operating assistance for the Orange County transit system utilizing FFY20 Section 5307 <br /> funding allocated to the Burlington UZA to assist in the cost of transit operations during <br /> the period of 07/01/2023 to 06/30/2024. <br /> The split/suballocation letter from NCDOT-IMD for the Burlington, 372630 UZA, is <br /> attached in TrAMS. <br /> STIP ID is TO-5220: Operating Assistance for Orange County, federal share: <br /> $133,787.00/local share: $133,787.00 Updated STIP documentation is forthcoming and <br /> will be attached upon receipt. <br />