Orange County NC Website
18 <br /> 1 Slide #6 <br /> Major Subdivision Review Process <br /> •General lot <br /> layout and <br /> road design <br /> established <br /> Plan for <br /> utilities and <br /> services <br /> Development <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> Z <br /> 3 Taylor Perschau said the Board will be looking at a concept plan this evening. <br /> 4 <br /> 5 Slide #7 <br /> Major Subdivision Review Process <br /> :. :. staff <br /> •General lot •Exact lot •All required <br /> layout and boundaries improvements <br /> road design and roadway are completed <br /> established engineering or bonded <br /> Plan for completed •All permitting <br /> utilities and Permitting and needs <br /> services design for identified in <br /> utilities earlier review <br /> completed phases are <br /> complete and <br /> submitted to <br /> County <br /> Development <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> 6 <br /> 7 Taylor Perschau explained that every type of major subdivision, whether standard or <br /> 8 conditional district rezoning, goes through the three-step process detailed on the slide. A concept <br /> 9 plan is a general layout and general road design, and it does come up with a plan for utilities and <br /> 10 services, but it does not engineer those utilities and services. She explained that if the rezoning <br />