Browse
Search
Agenda 12-09-2025; 12-4 - Information Item - Memorandum - Update on Orange County Trails Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 12-09-2025 Business Meeting
>
Agenda 12-09-2025; 12-4 - Information Item - Memorandum - Update on Orange County Trails Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:10:10 PM
Creation date
12/4/2025 2:56:48 PM
Metadata
Fields
Template:
BOCC
Date
12/9/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-4
Document Relationships
Agenda for December 9, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 12-09-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> second online survey, again offering a digital version of the workshop <br /> experience, was created and publicized using a variety of methods, and this <br /> survey ran from mid-October through November 9. <br /> Gensler, County staff and the Parks and Recreation Council have been at work <br /> this fall creating the basic framework of a draft Trails Plan, along with a <br /> preliminary trails segment map and prioritization ranking. Thematically, the <br /> framework that has emerged to date is focused on using the analysis of existing <br /> conditions and trends, evaluations of existing plans and trail systems, alignment <br /> with other policies and initiatives (such as the County Strategic Plan, the adopted <br /> Parks and Recreation Master Plan, draft Bicycle and Pedestrian Plan and draft <br /> Land Use Plan). Basic organizing concepts have emerged around creating <br /> connections between existing trail systems and open spaces or places of public <br /> interest in the towns and county, and addressing accessibility for all residents, <br /> particularly historically underserved communities. <br /> The public feedback and reaction to the initial draft map and prioritization is <br /> provided in the attached presentation, along with Project Goals, a Vision <br /> Statement crafted from PRC and public feedback, and draft Guiding Principles. <br /> The draft has been shared with the interdepartmental and partner work teams for <br /> review and comment. <br /> Next steps for the project would involve the completion of the draft Trails Plan, <br /> using the data analysis, public feedback to date and any Board direction from <br /> tonight's update. The final draft plan, complete with proposed trail connections, <br /> priorities, cost estimates and other supporting standards and documents, is <br /> planned to be presented to the Board in February. Before continuing to this step, <br /> Gensler and staff wished to share the work to date with the Board and receive <br /> any feedback or direction as the draft Plan is created. Estimated costs <br /> associated with the eventual Trails Plan and creation of prioritized trails as <br /> reflected in that document will be developed as part of the draft plan to be <br /> presented in February. <br /> Gensler and staff would invite any feedback and direction from the Board as the <br /> draft Trails Plan is created, to be brought for Board consideration in February. <br /> Please let me know if any I may provide any additional information. <br /> Attachments <br /> Copies: Caitlin Fenhagen, Deputy County Manager <br /> Orange County Department of Environment, Agriculture, Parks & Recreation <br /> PO Box 8181, Hillsborough, NC 27278 <br /> Phone: (919) 245-2510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.