Orange County NC Website
19 <br /> Draft Trail Priority Evaluation Criteria <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Each trail segment in the proposed <br /> network will be evaluated against a set Local Need <br /> of five criteria to determine the - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> project's level of priority. These ,' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> criteria are listed to the right. Estimated Total Project Cost <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Alignment with guiding principles and - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> level of community support are being <br /> Connectivity to Existing Infrastructure � <br /> informed by feedback received at the <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> September workshops, October pop- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br /> - <br /> ups, and Draft Trail Network survey. <br /> Alignment with Guiding Principles <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> � Level of Community Support � <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> DRAM�EIXINTY Gensler Orange County Trails Plan I Board of County Commissioners Update <br />