Browse
Search
12.10.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
12.10.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:13:20 AM
Creation date
12/4/2025 10:52:39 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land Use Buffers/Setbacks <br /> Setbacks — Front: 40-ft. from property or right of way line <br /> — Side and Rear: 20-ft. from the property line <br /> Landscape — 30-ft. Type B buffers required along New Jericho Road and Millhouse Road <br /> Buffers — 100-ft. Major Transportation Corridor Buffer required along Interstate 40 right of way <br /> Environmental Assessment (EA) <br /> The applicant has provided an Environmental Assessment (EA) application and supporting materials as <br /> required in Section 6.16 of the LIDO with their submittal. These materials have been shared with various <br /> State agencies via the NC Department of Administration's State Clearinghouse. Planning and DEAPR <br /> Staff have jointly reviewed the materials and agree with a determination of"Finding of No Significant <br /> Impact (FONSI)" as required in Section 2.25.1 (B) (5) of the UDO (Attachment 5). This determination <br /> eliminates a requirement from the applicant to provide a more detailed Environmental Impact Statement <br /> (EIS) process as outlined in Sections 2.25.2 and 6.16.4 of the UDO. <br /> Solid Waste <br /> The site is currently served by a private solid waste contractor. <br /> Proposed Conditions <br /> The following conditions include conditions of approval contained in the existing SUP approved in 2015. <br /> 1. That the school be limited to serving 350 students as proposed by the applicant within the Special <br /> Use Permit application. <br /> 2. The granting of this Special Use Permit does not confer onto the applicant authorization to <br /> commence construction/land disturbance activities. No land disturbance activity shall commence <br /> until all applicable approvals, as detailed within the Unified Development Ordinance, have been <br /> obtained. <br /> 3. The submittal of a Solid Waste Permit application shall be required for every individual <br /> development project associated with this project. <br /> 4. Existing vegetation shall be preserved and remain in an undisturbed state in general <br /> conformance with Sheet L5.00 on the sealed "Special Use Permit Modification Drawings"from <br /> The John R. McAdams Company, Inc., dated October 17, 2025. <br /> 5. That the Fire Marshal and representatives of the New Hope Volunteer Fire Department shall <br /> review and approve the floor plan of proposed new buildings prior to the issuance of any Building <br /> and/or Zoning Compliance Permit(s) approving construction verifying that the structures comply <br /> with all applicable NC Fire Protection Code standards. <br /> 6. The applicant shall install required wastewater treatment system improvements necessary to <br /> support approved expansion projects prior to the commencement of earth disturbing activities. <br /> Further, the school is required to supply Planning and Environmental Health staff will any and all <br /> permits issued by the State of North Carolina allowing for the operation/modification of the <br /> system. <br /> 7. That an annual inspection of the wastewater treatment facility shall be conducted by the Orange <br /> County Health Department, consistent with established Departmental policy, in order to ensure <br /> that the system is functioning within established parameters. The applicant shall bear the burden <br /> of paying all fees associated with this inspection of the wastewater treatment facility as imposed <br /> by the Health Department. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.