Browse
Search
12.10.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
12.10.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:13:20 AM
Creation date
12/4/2025 10:52:39 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Access and Transportation Network Improvements <br /> The existing main school campus will access New Jericho Road via four access ways. A Traffic Impact <br /> Analysis (TIA) and Traffic Management Plan (TMP) was completed in 2014 as part of the 2015 SUP and <br /> was based on a student enrollment of 350. Another Traffic Management Plan was completed in November <br /> 2024. Based on the Traffic Impact Analysis Validation letter completed by McAdam (Attachment 1), the <br /> 2014 TIA and 2024 TMP accurately reflect current school conditions and operations. As a result, no <br /> additional transportation improvements are expected. In addition, a TIA addendum for the SUP <br /> modification is not expected or needed. <br /> The master plan was previously reviewed by NCDOT in 2015. NCDOT reviewed the proposed modification <br /> and determined the proposal was not a major change from what was previously reviewed by NCDOT. As a <br /> result, no action or approval is required. <br /> Summary of Transportation Information <br /> Existing Roadway Characteristics <br /> Affected Roadway New Jericho Road Millhouse Road <br /> Type of Roadway Secondary Secondary <br /> Current Roadway 12,000 — 14,000 <br /> Capacity 10,000-19,999 <br /> Latest Traffic Volume 14,660- 15,100 8,900- 9100 <br /> Traffic Generation <br /> Number of Trips Expected to be Generated by AM Peak Hour- 372 trips <br /> Proposed Project PM Peak Hour- 211 trips <br /> Proposed Utilities <br /> The existing school campus is served via a private well and septic system. The existing Water System <br /> Permit was permitted by Division of Water Quality (DWQ) and may accommodate a total capacity of 360 <br /> students and 55 staff members. As construction of new buildings occurs, the existing well permit and <br /> system shall be reviewed by DWQ. <br /> In addition, the existing septic system was permitted by NCDENR Division of Water Quality. As <br /> construction of new building occurs, the existing permit and system shall be reviewed by NC Department <br /> of Health and Human Services (DHHS). Updates or revisions may be made to the permit to include <br /> additional wastewater flows. Additional septic field capacity may be required if existing capacity is met. The <br /> existing permit is in effect to August 31, 2026 and will be renewed by the school. <br /> Additional information regarding the existing State permits is contained in Attachment 2. <br /> Erosion Control/Stormwater Regulations <br /> The applicant has indicated the project will conform to existing Stormwater Management (Section 6.14) <br /> and Erosion and Sedimentation Control (Section 6.15) regulations of the UDO. Attachment 5 includes <br /> Development Advisory Committee (DAC) comments from Orange County Erosion and Sedimentation <br /> Control and Stormwater Management staff. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.