Orange County NC Website
307 <br /> 48. 401 Water Quality Certification-Compliance with the T15A 02H .0500 Certifications are required whenever <br /> construction or operation of facilities will result in a discharge into navigable water as described in 33 CFR part <br /> 323. <br /> McAdams Response: Understood. <br /> 49. Compliance with Catawba,Goose Creek,Jordan Lake, Randleman,Tar Pamlico or Neuse Riparian Buffer Rules is <br /> required. Buffer requirements: http://deq.nc.gov/about/divisions/water-resources/water-resources- <br /> permits/wastewater-branch/401-wetlands-buffer-permits/401-riparian-buffer-protection-program <br /> McAdams Response:Understood. <br /> 50. Notification of the proper regional office is requested if"orphan"underground storage tanks(USTS)are <br /> discovered during any excavation operation. <br /> McAdams Response:Understood. <br /> 51. Plans and specifications for the construction,expansion,or alteration of a public water system must be <br /> approved by the Division of Water Resources/Public Water Supply Section prior to the award of a contract or the <br /> initiation of construction as per 15A NCAC 18C .0300 et. seq., Plans and specifications should be submitted to <br /> 1634 Mail Service Center, Raleigh, North Carolina 27699-1634. All public water supply systems must comply <br /> with state and federal drinking water monitoring requirements. For more information,contact the Public Water <br /> Supply Section, (919)707-9100. <br /> McAdams Response:Understood. <br /> 52. If existing water lines will be relocated during the construction, plans for the water line relocation must be <br /> submitted to the Division of Water Resources/Public Water Supply Section at 1634 Mail Service Center, Raleigh, <br /> North Carolina 27699-1634. For more information,contact the Public Water Supply Section, (919)707-9100. <br /> McAdams Response:Understood. <br /> NCDEQ - DWR-WQROS <br /> Raleigh Regional Office - Phone: 919.791.4200 <br /> 53. Three mapped features are depicted within/near the project area that may be subject to riparian buffer rules.Any <br /> impacts to the riparian buffer will need a buffer determination/authorization from local program. If public funds <br /> are being utilized for the project, DWR will need to perform the determination. If any impacts to surface water are <br /> anticipated ,401/404 approval may be required. <br /> McAdams Response:Understood. <br /> MCADAMS 9 of 10 <br />