Browse
Search
12.10.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
12.10.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:13:20 AM
Creation date
12/4/2025 10:52:39 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
303 <br /> 28. Parking terminal islands shall have a minimum of 300 square feet. Please add dimensions for proposed <br /> terminals. <br /> McAdams Response:All parking terminal islands have been dimensioned to square footage.See the <br /> Master Site Plan—Area`A',Sheet C2.00. <br /> 29. All parking spaces and maneuvering space shall be surfaced with an all-weather paving material,such as asphalt <br /> or concrete,and maintained in a safe,sanitary and neat condition. If all-weather paving materials is not to be <br /> met,a condition will need to be submitted for BOA approval. <br /> McAdams Response:The applicant would like to request a modification to the requirement that all parking <br /> and maneuvering spaces shall be constructed from an all-weather paving material. <br /> 30. Estimated traffic generated by the proposed development in trips per day, including AM and PM peak numbers <br /> shall be added to the site plan. <br /> McAdams Response:The estimated traffic generated for both AM and PM peak hours have been added to <br /> the Site Plan.See the Site Data Table on the Master Site Plan—Area`A',Sheet C2.00. <br /> 31. Add note stating all proposed lighting shall be required to meet Section 6.11 of the Orange County Unified <br /> Development Ordinance. <br /> McAdams Response:The provided note has been added.See the"General Landscape and Tree Protection <br /> Notes"on the Landscape Plan,Sheet L5.00. <br /> Stormwater Management <br /> Christopher Sandt - csandt@orangecountync.gov <br /> 32. The project is located in the Jordan Lake Unprotected Watershed Overlay District.The submittal of a Stormwater <br /> Management Plan (SMP)is required for any proposed Land-Disturbing Activity exceeding 43,560 square feet. <br /> Land disturbance thresholds are cumulative to parent tract and will carry over to any/all subdivided lots. <br /> McAdams Response: Per coordination with Christopher, no action is needed on this comment. Final SCM <br /> design will be provided during the Zoning Compliance Permit application. <br /> North Carolina Wildlife Resources Commission <br /> Olivia Munzer - olivia.munzer@ncwildlife.org <br /> 33. We recommend minimizing the amount of tree clearing,especially of large hardwoods. For any new construction, <br /> build within the open pasture so forested areas can be left undisturbed. <br /> McAdams Response:Understood. <br /> 34. We recommend not clearing trees during the coldest winter months(December 15 to February 14)and pup <br /> rearing months(April 15 to July 31)to minimize impacts to the tricolored bat <br /> McAdams Response:Understood. <br /> MCADAMS 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.