Orange County NC Website
308 <br /> 19. Identify plantings or note Section 6.8.6(I) Foundation Plantings will be met. <br /> McAdams Response:A note specifying that Foundation Plantings requirements will be met per Section <br /> 6.8.6 of the Orange County UDO has been added.See the"General Landscape and Tree Protection Notes" <br /> on the Landscape Plan,Sheet L5.00. <br /> 20. Identify plantings or note Section 6.8.6(J) Landscaping of Vehicular Use Areas will be met. <br /> McAdams Response:A note specifying that Landscaping of Vehicular Use Areas requirements will be met <br /> per Section 6.8.6 of the Orange County UDO has been added.See the"General Landscape and Tree <br /> Protection Notes"on the Landscape Plan,Sheet L5.00. <br /> 21. Label required landscape buffers(i.e. 30 ft.Type B Landscape Buffer)per Section 6.8.6 of the LIDO. <br /> McAdams Response:The required landscape buffers per Section 6.8.6 of the UDO have been added.See <br /> the See the Master Site Plan,Sheets C2.00-C2.02. <br /> 22. Add note stating"Open burning of trees, limbs, stumps, and/or construction debris associated with the <br /> permitted activity is expressly prohibited". <br /> McAdams Response:The provided note has been added.See the"General Landscape and Tree Protection <br /> Notes"on the Landscape Plan,Sheet L5.00. <br /> 23. Provide building setbacks to the closest parcel line for all proposed buildings. <br /> McAdams Response: Building setback dimensions have been provided for all proposed buildings.See the <br /> Master Site Plan,Sheets C2.00-C2.01. <br /> 24. Add minimum building setbacks to the Site Date table. <br /> McAdams Response: Minimum building setbacks and landscape buffers have been added to the Site Data <br /> Table.See the Master Site Plan-Area`A',Sheet C2.00. <br /> 25. Identify and label required Major Transportation Corridor setback and landscape buffer requirements per <br /> Sections 4.6.4 and 6.6.4. <br /> McAdams Response:The 100' Major Transportation Corridor Setback and 100' Landscape Buffer has been <br /> identified and labeled per Sections 4.6.4 and 6.6.4 in the Orange County UDO.See the Master Site Plan- <br /> Area`A',Sheet C2.00. <br /> 26. Per Section 6.9.10, standard parking spaces shall be a minimum of 180 sq.ft.Compact parking spaces are <br /> permitted per Section 6.9.10(B)(2). <br /> McAdams Response:The applicant would like to request a modification to the minimum size of standard <br /> parking spaces for the development. <br /> 27. No more than ten parking spaces shall be permitted in a continuous row without being interrupted by a terminal <br /> landscape island.There appears to be three rows with more than 10 continuous spaces. <br /> McAdams Response:All rows with more than 10 continuous spaces have been updated to meet the <br /> requirements of max 10 continuous spaces.See the Master Site Plan-Area`A',Sheet C2.00. <br /> WADAMS 4of10 <br />