Orange County NC Website
305 <br /> 00 <br /> 10. Confirm with staff if conditions are being proposed. If yes, please provide to staff for review. <br /> McAdams Response:A list of conditions that the applicant would like to request modifications for has been <br /> included with this submission. <br /> APPLICATION <br /> 11. The narrative notes a submittal of a TIA Traffic Review Memo. However,this does not appear in the application <br /> package. Please provide to staff. <br /> McAdams Response:The TIA Traffic Review Memo has been provided with this submission. <br /> 12. Statement from the applicant indicating the anticipated development schedule for the project. <br /> McAdams Response:The applicant anticipates submitting for Zoning Compliance Permits for the <br /> development as soon as the SUP Modification is approved.The total project duration is unknown as the <br /> development will be phased by building. <br /> 13. Elevations of structures proposed to be used in the development. <br /> McAdams Response:The applicant does not have elevations for all proposed buildings on site.We've <br /> included the elevations available.All proposed buildings will resemble the existing buildings on site. <br /> SITE PLAN <br /> 14. Provide building height and finished floor elevations for all structures on the site plan. <br /> McAdams Response:The applicant would like to request a modification to the maximum building height for <br /> the development. Final FFEs for the proposed buildings will be determined during the Zoning Compliance <br /> Permit application. <br /> 15. Existing stream shall require a 65 ft. buffer. <br /> McAdams Response:The 15'Orange County Slope Buffer has been reflected for the existing stream, in <br /> addition to the 50' buffer already shown.See the Existing Conditions-Area `B',Sheet C1.01. <br /> 16. Label primary tree protection areas per Section 6.8.4(A). <br /> McAdams Response:The primary tree protection area has been shown.The secondary tree protection area <br /> will be defined during the Zoning Compliance Permit application when more detailed disturbance limits are <br /> shown.See the Master Site Plan,Sheets C2.00-C2.02. <br /> 17. Identify plantings or note Section 6.8.6(F)Street Trees will be met. <br /> McAdams Response:A note specifying that Street Trees requirements will be met per Section 6.8.6 of the <br /> Orange County UDO has been added.See the"General Landscape and Tree Protection Notes"on the <br /> Landscape Plan,Sheet L5.00. <br /> 18. Identify plantings or note Section 6.8.6(H) Between Lot Plantings will be met. <br /> McAdams Response:A note specifying that Between Lot Plantings requirements will be met per Section <br /> 6.8.6 of the Orange County UDO has been added.See the"General Landscape and Tree Protection Notes" <br /> on the Landscape Plan,Sheet L5.00. <br /> 'J WADAMS 3of10 <br />