Browse
Search
12.10.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
12.10.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:13:20 AM
Creation date
12/4/2025 10:52:39 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
300 <br /> Environmental Health <br /> Thomas Privott - Tprivott@orangecountync.gov <br /> 4. The Department has records for this parcel. <br /> McAdams Response:Understood. <br /> Erosion Control <br /> Tyler Sliger - Tsliger@orangecountync.gov <br /> 5. Any project proposingto disturb over 21,780 sq. Ft.Of disturbance will need to obtain a land disturbance permit. <br /> McAdams Response:Understood. <br /> Fire and Life Safety <br /> Stephan Smith - stesmith(c)orange countvnc.gov <br /> 6. Occupancy falls under NC Fire code regulations. <br /> McAdams Response:Understood. <br /> 7. Any additional fire and life safety systems or system modifications will require a permit and plan review approval. <br /> McAdams Response:Understood. <br /> NCDOT <br /> David Genwright - digenwright@ncdot.gov <br /> 8. This project appears to fall within the limits of a study that was completed and reviewed in 2015.This study <br /> Looked at an expansion to 350 students and the accesses that would be used at designated times. Based on the <br /> proposal,the current plan does not have any major changes relative to access and internal circulation. If major <br /> changes are proposed here or in the future,we will have to revisit the study and update recommendations based <br /> on the revisit.As is, no NCDOT action or approval will be required. <br /> McAdams Response:Understood. <br /> Planning <br /> Ashley Moncado - amoncado@orangecountync.gov <br /> GENERAL <br /> 9. Statement from the applicant in justification of any request for vesting for a period of more than two years. <br /> McAdams Response:The proposed development will be constructed as a phased development and <br /> completed one building at a time,therefore the applicant would like to request a vesting period for the <br /> overall development. <br /> WADAMS 2of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.