Browse
Search
12.10.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
12.10.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:13:20 AM
Creation date
12/4/2025 10:52:39 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
298 <br /> 12. Identfy and label required Major Transportation Corridor setback and landscape <br /> buffer requirements per Sections 4.6.4 and 6.6.4. <br /> 13. Per Section 6.9.10, standard parking spaces shall be a minimum of 180 sq. ft. <br /> Compact parking spaces are permitted per Section 6.9.10(B)(2). <br /> 14. No more than ten parking spaces shall be permitted in a continuous row without <br /> being interrupted by a terminal landscape island. There appears to be three rows <br /> with more than 10 continous spaces. <br /> 15. Parking terminal islands shall have a minimum of 300 square feet. Please add <br /> dimensions for proposed terminals. <br /> 16. All parking spaces and maneuvering space shall be surfaced with an all-weather <br /> paving material, such as asphalt or concrete, and maintained in a safe, sanitary <br /> and neat condition. If all-weather paving materials is not to be met, a condtion will <br /> need to be submitted for BOA approval. <br /> 17. Estimated traffic generated by the proposed development in trips per day, <br /> including AM and PM peak numbers shall be added to the site plan. <br /> 18. Add note stating all proposed lighting shall be required to meet Section 6.11 of <br /> the Orange County Unified Development Ordinance. <br /> Matt Taylor <br /> Solid Waste Date: 9/2/25 Staff: mtaylor(aD_orangecountync.gov <br /> 919-918-4905 <br /> 1. No comment. <br /> Stormwater Christopher Sandt <br /> Management Date: 08/29/25 Staff: csandt(a_orangecountync.gov <br /> 919-245-2583 <br /> 1. The project is located in the Jordan Lake Unprotected Watershed Overlay District. The <br /> submittal of a Stormwater Management Plan (SMP) is required for any proposed Land- <br /> Disturbing Activity exceeding 43,560 square feet. Land disturbance thresholds are <br /> cumulative to parent tract and will carry over to any/all subdivided lots. <br /> Transportation Nishith Trivedi <br /> Services Date: Staff: Ntrivedi(a-orangecountync.gov <br /> 919-245-2007 <br /> 1. No comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.