Browse
Search
Agenda - 09-20-2005-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-20-2005
>
Agenda - 09-20-2005-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 3:56:19 AM
Creation date
8/29/2008 10:45:06 AM
Metadata
Fields
Template:
BOCC
Date
9/20/2005
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20050920
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
RES-2005-071 Comments to TAC or DCHC MPO on transportation priorities list for 2007-2013 improvement program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MICHAEL F, EASt,z;Y <br />GOVERNOR <br />ATTACNMENT3 <br />52 <br />•~ <br />STATE OF NORTH CAROLINA <br />pEPARTMENT OF TRANSPORTATION <br />Lvtroo T'IPPfiTT <br />SECRETARY <br />August 15, 2005 <br />Felix Nwoko, Administrator <br />Durham-Chapel Hill-Carrboro MPO <br />101 City Hall Plaza <br />Durham, NC 27701 <br />R.E: Draft Regional Priority List for the FY 2007-13 TIP <br />Dear Felix: <br />Project I-0305 (I-85 wi onTyg1fT0 Be ause of the proj cYs importance to the Department,it is <br />included in the draft p <br />requested that MI'O staff rate the project and include it in the final draft priority tist for <br />consideration by the TAC during its meeting on September 14, 2005. <br />Project I-0305 has consistently appeared in local and regional transportation plans for over ten <br />years. The project is recommended as an 8-lane facility in the Orangee County portionhof the <br />Plan Study Report (1990), which is the most recent plan for the Orang <br />MPO. Project I-305 is cited in the Transpodesion ~i ht of-wayTand consitru ion in the DCHC <br />The project was programmed for planning, ~, g <br />Metropolitan Transportation Improverneni Plan for° FY 2004-2010. Widening I-85 to six lanes in <br />the project area was included in the 2025 Long Range Transportation Plan of the DCHC-MPO, <br />and is included in the 2030 Long Range Ti°an.rportotion Plan of the DCHC-MPO. <br />Because of the current debate within the MPO on the need and the priority for the project, I want <br />to take the opportunity to explain why Project I-305 is important to the Department and to <br />provide data to help you race the project for the priority list. <br />HiQhway~a s p ~ k I 85 providessmajortravel servicenwithin and through the Durham urban al <br />and hrgh y <br />area, 1-85 is also part of'the National Highway System and is heavily used by automobile an <br />truck (freight) traffic because it provides direct co Vi triniabDurham, Greensboro,rand Chazlotte, <br />the Southern United States: Richmond-Petersburg, g <br />North Cazolina; Spartanburg and Greenville, South Carolina; and Atlanta, Georgia- Furthermore, <br />I-85 provides linkages to I-40 and I-20, both important transcontinental routes. <br />Relieve Future Congestion Daily traffic volume for the year 2030 is estimated to range from <br />78,200 at the west end of the project to 97,200 at the east end of the project. WocnooNCapacity <br />TION BNLDItJG <br />T ~ P ~ E3 TMNSPORTA <br />MAILING ADDRESS: ® ® ~ SOUTH WILMINGTON STREET <br />NC DEPARTMENT OF TRANSPDRTATION r`^wr~wc, u~• c~ RALEIGH, NC 27607 <br />TRPNSPORTATION PLANNING BRANCH "~'c'npTwwwWCDOT.ORG Phone: 919-733-0705 <br />7554 Iv7PIL SERVICE CENTER Fax; gig-733-2417 <br />RALEIGH tJC 27699-7554 <br />
The URL can be used to link to this page
Your browser does not support the video tag.