Browse
Search
ORC Agenda Packet - Dec 3 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2025
>
ORC Agenda Packet - Dec 3 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:01:43 PM
Creation date
12/2/2025 4:00:58 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: UsTf <br /> Section 5.10: Standards for Telecommunication Facilities <br /> the County for its services in reviewing the application, including the construction and <br /> modification of the site, once permitted. The fees for these services shall be reimbursed <br /> by the applicant up to the statutory limits. <br /> 5.10.3 Submittal Requirements for all New Wireless Telecommunication Facilities and Substantial <br /> Modifications Requiring a Special Use Permit <br /> An application meeting the requirements of Sections 2.7, 5.10.2, and this section is required. The <br /> application will be processed as any other application for a Special Use Permit (SUP) provided <br /> that the standards of this section are met. <br /> (A) Procedure for Approval <br /> (1) Applications shall be approved according to the following schedule. If a decision <br /> is not reached within the allotted period, the application shall be automatically <br /> approved. <br /> TIME To DEEM APPLICATION TIME DECISION AFTER TOTAL TIME To DECIDE <br /> FACILITY REQUESTED COMPLETE(DAYS) APPLICATION IS COMPLETE (DAYS) <br /> New Wireless Support Structure <br /> requiring a Special Use Permit, <br /> Site Plan Approval,or a 30 (10 for re-submittals) 60 90 <br /> Substantial Modification <br /> Collocation 30 (10 for re-submittals) 45 75 <br /> Small/Micro Wireless Facility 30 (10 for re-submittals) 45 75 <br /> 5.10.4 Standards and Procedures for Administrative Approvals of Wireless Support Structures, <br /> Substantial Modifications, Collocations and Eligible Facility Requests <br /> (A) Applicability <br /> The following telecommunication facilities may be approved administratively by the <br /> County provided that all of the provisions contained in Section 5.10 are met: <br /> (1) New stealth telecommunications wireless support structures; <br /> (2) Any monopole wireless support structure less than 75 feet in height; <br /> (3) Any wireless support structure less than 215 feet in height located on property <br /> that is owned or leased by <br /> (a) Orange County; <br /> (b) A voluntary fire organization; <br /> (c) An Emergency Service organization; and/or <br /> (d) Any other public entity; <br /> (4) A wireless support structure less than 215 feet in height on which the owner of <br /> such facility permits the County to collocate its wireless facilities on the structure <br /> at no charge to the County, at the County's request; <br /> (5) Small and Micro-Wireless Facilities as defined and regulated by Section 5.10.85; <br /> (6) Applications for"Eligible Facilities Requests" or collocation on Wireless Support <br /> Structures or other structures meeting the following requirements: <br /> (a) The proposed additional facility will not increase the overall height of the <br /> tower by <br /> (i) More than ten percent or; <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.