Browse
Search
Agenda - 09-20-2005-5n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-20-2005
>
Agenda - 09-20-2005-5n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 3:56:32 AM
Creation date
8/29/2008 10:44:55 AM
Metadata
Fields
Template:
BOCC
Date
9/20/2005
Document Type
Agenda
Agenda Item
5n
Document Relationships
2005 S ERCD - Approval of MOA - Joint Greenhouse Gas Emissions Inventory & Action Plan
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2005
Minutes - 20050920
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f0 <br />By comparing the scenarios against the baseline inventory and Business as Usual (BAU) <br />Forecast completed in phase 2, future GHG emissions targets can be established. At this <br />stage in the project the AQAC Groups can consider the results of the measures <br />quantification process and agree upon a recommended GHG emissions target. <br />[NEED TO WORK IN SOMETHING ON THE CRED PRO.IECT IN CHAPEL HILL <br />(60% target reduction by 2050) <br />Phase 6 - Forrnalate and Approve Local Action Plan <br />The last phase in the project will entail drafting and finalising the Local Action Plan, The <br />report will be drafted by IES and then circulated to the AQAC for comment within a <br />specified timeframe, The AQAC will be presented with the Draft Report by IES. <br />Comments will then be incorporated into the report and a final report will be produced. <br />Should the report require approval by other staff, it will occur at this phase. The Final <br />Report will be presented to the AQAC, the Transportation Advisory Committee of the <br />DCHC MPO and the governing boazds of Cazrboro, Chapel Hill and Orange Country for <br />adoption.. <br />The local governments will be provided with multiple copies of the final report as well as <br />.pdf versions and copies of the CCP GHG software files. <br />
The URL can be used to link to this page
Your browser does not support the video tag.