Orange County NC Website
f0 <br />By comparing the scenarios against the baseline inventory and Business as Usual (BAU) <br />Forecast completed in phase 2, future GHG emissions targets can be established. At this <br />stage in the project the AQAC Groups can consider the results of the measures <br />quantification process and agree upon a recommended GHG emissions target. <br />[NEED TO WORK IN SOMETHING ON THE CRED PRO.IECT IN CHAPEL HILL <br />(60% target reduction by 2050) <br />Phase 6 - Forrnalate and Approve Local Action Plan <br />The last phase in the project will entail drafting and finalising the Local Action Plan, The <br />report will be drafted by IES and then circulated to the AQAC for comment within a <br />specified timeframe, The AQAC will be presented with the Draft Report by IES. <br />Comments will then be incorporated into the report and a final report will be produced. <br />Should the report require approval by other staff, it will occur at this phase. The Final <br />Report will be presented to the AQAC, the Transportation Advisory Committee of the <br />DCHC MPO and the governing boazds of Cazrboro, Chapel Hill and Orange Country for <br />adoption.. <br />The local governments will be provided with multiple copies of the final report as well as <br />.pdf versions and copies of the CCP GHG software files. <br />