Orange County NC Website
16 <br /> Slide #14 <br /> Design Option B.2. <br /> Option B.I.with decreased BHUC bays from 12 to G <br /> RHUC <br /> B u ilding Size <br /> 15.000 sf �I � '��m ❑�' Ex�s�' <br /> Cost EstimateY n a„ <br /> $24,980,984 <br /> Future Community Addition Ew <br /> $842,526 <br /> FBC Beds:16 <br /> BHUC Bays:6 .. ..." •" _• <br /> [2 Pediatric.4 Adult/ <br /> Dual-Side Entry <br /> FBC Requested Room Count O <br /> BHUC Requested Bay Count <br /> FBC Courtyard <br /> Conference Space other: Reduced SF by 30% <br /> Peer Living Split Enhance Vestibules,Some Side <br /> Resource Center Squared up bullding archlte0u. <br /> County Offices f DfSchtlrge Reduced Perking from 50 fa 40 <br /> 25%Decrease of Underground Starmwater Retentlon <br /> Added space for Cammanily C4r,-and Discharge <br /> Slide #15 <br /> Design Option C <br /> Original Design <br /> Eliminated architectural features <br /> neue <br /> Building Size <br /> 19.825 sf <br /> Cost Estimate <br /> FBC Beds:16 ..,, ,.v _ �`• <br /> BHUC Bays:12 ,,,,x, <br /> 14 Pedi.Me,8 Atlult) vr <br /> a" <br /> Dual Side Entry ®• '" .,. .,. <br /> FBC Requested Room Count NA <br /> BHUC Requested Be,Count -- "• — O m" <br /> CBC Courfy Sp O O <br /> Conference Space other: Reduced SF by 11% <br /> Peer Living Squared up building architecture f O O <br /> Resource Center <br /> County Offices/Discharge O �I <br /> U <br />