Orange County NC Website
15 <br /> Slide #12 <br /> Design Option B <br /> Dual entry for at front of facility <br /> No coordinated discharge/resource space <br /> eNrlq <br /> Building <br /> 15,850sf <br /> Cost Estimate •�� " "• YY <br /> $25,402,124 <br /> Suture Community Addition El� <br /> 842,526 <br /> FB[Beds:16 {' Uh�, " y II�,•••,°., <br /> BHUC Bays:12 <br /> 14 Pediatric,B Adult) <br /> Dual-Side Entry <br /> FBC Requested Room Count a. <br /> BHUC Requested Bay Count <br /> FBC Courtyard <br /> Conference Space other: Reduced 5F by 26% <br /> Peer Ll Ortg Split Entrance Ve9lbules,Same Side <br /> Resource Cenler Squared up building architecture <br /> CountyOfllces l Discharge Reduced Parking from 50 to 40 " <br /> • 25%Decrease of Underground 51—water <br /> Retention <br /> Slide #13 <br /> Design Option B.1 . <br /> Option B with coordinated discharge <br /> No resource space <br /> BHuc <br /> 1lu <br /> 6,ODO sf Size w. W, L <br /> 6,000 sf � .. <br /> Cost Estimate <br /> $25,550,015 FBC <br /> Future Community Addition <br /> $842,526 <br /> FBC Beds:16 e <br /> BHUC Bays:12 ' V. <br /> 14 Pediatric,B Adult) <br /> Dual Side Entry " <br /> FBC Requested Room Count <br /> BHUC Requested Bay Count <br /> FEC Courtyard <br /> Conference Space other: Reduced SF by25% <br /> Peer Living Spill Entrance Vestibules,Same Side <br /> Resource Center Squared up bullding architecture <br /> County Dfllces(Discharge Reduced Porking tram 501.40 <br /> 25%Decrease of Underground S7Gmwaler Retention <br /> Added space tar Cammanity Offices and Discharge - <br />