Orange County NC Website
13 <br /> Slide #8 <br /> Original Design <br /> Current Project Budget Available- $22,484,884 <br /> Building Size <br /> 22,405 sl eituc �- •a• ;` <br /> �� � k YO ■ <br /> Cost Estimate <br /> $28,190,991 $ e e 3 <br /> FBC Beds:16 <br /> Biiut Bays:12 <br /> (4 Pediatric,8 Adult) <br /> as �y <br /> Duat-5ide Entry ! r - <br /> FBC Requested Roam Court lei; <br /> BHUC Requested Bay Count - <br /> FBC Courty-n! - per— <br /> Cantarence Space ® - m <br /> Peer Living <br /> Resouce Center <br /> County,Otfcesl Discharge — <br /> � o <br /> Slide #9 <br /> Design Option A <br /> Reduce BHUC from 12 to 6 and FBC from 16 to 8 <br /> No coordinated discharge/resource space <br /> all�r <br /> Building5i2e m� �• � � <br /> 10,080 St <br /> Cost Estimate <br /> Future Community addition <br /> $84252E <br /> FBC Beds:8 <br /> BHUC Bays:6 <br /> f2 Pedlohic,4 Adulll <br /> Dual Side Entry <br /> FBC Requested Room Count <br /> BHUC Requested Bay Count <br /> FBC Courtyard <br /> Conference Space other: Reduced5F by55% <br /> Peer Living Spill Enhances,Same Vestibule <br /> Resource Center Squared up building architecture <br /> County Oftices(Oischarge Reduced Parkingfram50ta25 <br /> No Underground Stormwater Retentlon <br />