Orange County NC Website
IMPO, the Rural Buffer zoning is still too rigid <br /> — even with "Flexible Development" -- and <br /> does not allow the greater flexibility of CSD, <br /> which would enable new developments <br /> at the desired overall two-acre density <br /> to conserve much more land, with smaller lots. <br />