Orange County NC Website
OBIA O'Brien/Atkins Associates, PA 7 <br /> o'BPIEN ATKINs Architecture I Engineering I Landscape Architecture I Planning I Interiors <br /> F. The projects will implement sustainable elements, but formal certification with LEED or other <br /> environmental agency is not included in this proposal. <br /> G. The change of the Link Building from an office building to a Sheriff's office may instigate a <br /> change in occupancy and thus a change to the structural Risk category making it a Risk category <br /> IV which will cause some structural remediation. We will study this in predesign and provide <br /> feedback on use and any fee adjustments <br /> H. The fees for Furniture and Equipment (FFE) design and procurement are not included in this <br /> proposal. General FIFE layout and coordination is included. <br /> I. Startup and commissioning services is excluded. Engineering support of commissioning activities <br /> is included. <br /> 7. Proposed Fees <br /> O'Brien Atkins proposes the following fees to provide the design services described above as identified <br /> in the entire contents of this proposal. <br /> Programming and Pre-Design $105,500.00 <br /> Schematic Design Phase $268,205.00 <br /> Design Development Phase $381,288.00 <br /> Construction Documentation Phase $581,559.00 <br /> Bidding and negotiation phase $48,804.00 <br /> Construction Administration Phase $421,926.00 <br /> Close Out $46,904.00 <br /> Total: <br /> $1,854,186.00 <br /> The lump sum fee for the scope of services listed in this proposal is One Million, Eight Hundred Fifty- <br /> Four Thousand One Hundred and Eighty-Six Dollars($1,854,186.00).This is inclusive of Reimbursable <br /> expenses. <br /> Post Office Box 12037 1 Research Triangle Park, NC 127709 <br /> 919.941.9000 1 www.obrienatkins.com <br /> P15 <br />