Orange County NC Website
Attachment F 42 <br /> ATTACHMENT - 2 <br /> STEWART ENGINEERING, INC. ..� <br /> Structural Hourly Rates STEWART <br /> e (As of July 15, 2025) <br /> -_. LUMP SUM RATES - STRUCTURAL ENGINEERING <br /> STANDARD HOURLY RATES REIMBURSABLE EXPENSES <br /> Classification Hourly Rate Classification Rate <br /> Construction Administrator I $145.00 Plotted Base Paper $5.00/sheet <br /> Construction Administrator II $150.00 Plotted Base Vellum $7.50/sheet <br /> Construction Administrator III $165.00 Plotted Base Mylars $14.00/sheet <br /> Structural BIM Designer I $115.00 Plotter Base Paper (Colored) $10.00/sq. ft. <br /> Structural BIM Designer II $125.00 Photocopies (8 1/2 x 11) $.20/sheet <br /> Structural BIM Designer III $170.00 Photocopies (11 x 17) $.40/sheet <br /> Structural BIM Designer III/BIM $180.00 Mileage $.67/mile <br /> Leader Telephone/Courier As Incurred <br /> Structural Graduate Engineer $120.00 Double Sided Photocopies p' $.40/sheet <br /> Structural Project Engineer $165.00 Color Copies (8 1/2 x 11) $1.00/sheet <br /> Structural Senior Project Engineer $190.00 Color Copies (11 x 17) $3.00/sheet <br /> Structural Project Manager $200.00 Card Stock, color <br /> $2.25/sheet <br /> Structural Senior Project Manager $205.00 Fax (Local) $.50/sheet <br /> Assistant Manager, Structural $215.00 Fax (Long Distance) $.75/sheet <br /> Engineering <br /> Manager, Structural Engineering $240.00 <br /> Process & Quality Control Manager $205.00 <br /> Expert Testimony $350.00 <br /> Principal in Charge $250.00 <br /> Practice Leader, Structures $270.00 <br /> Student Intern, Structures $100.00 <br /> WWW.WEARESTEWART.COM STRENGTHENING COMMUNITIES ACROSS THE CAROLINAS <br />