Browse
Search
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:07:02 PM
Creation date
11/13/2025 3:09:13 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-18-2025 Business Meeting
ORD-2025-037-Unified Development Ordinance Text Amendments –Impervioius surfaces watershed protection
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-097-Statement of Inconsistency of a Proposed Zoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-099-White Cross Fire Truck Financing and Authorization for the Chair to Execute Required Documents
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-036-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-037-Abolition Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-059- North Carolina Governor’s Highway Safety Program – Orange County Sheriff’s
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> 12.7 Ownership of Documents <br /> 12.7.1 All designs, drawings, specifications, design calculations,notes and other works developed in the performance of this contract <br /> shall become the property of the Owner when Designer has been paid in full for its Services and may be used on any other project without <br /> additional compensation to the Designer. Designer does not warrant the use of the documents by the Owner or by any person or entity for <br /> any purpose other than the Project as set forth in this agreement. <br /> 12.8 E-Verify <br /> 12.8.1 Pursuant to the terms of North Carolina General Statutes no county may enter into a contract unless the Designer and its <br /> subconsultants comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, failure <br /> to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Designer's breach of this <br /> Agreement. By executing this Agreement Designer affirms Designer is in compliance with Article 2 of Chapter 64 of the North Carolina <br /> General Statutes. <br /> 12.9 Electronic Signatures <br /> 12.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed <br /> hereto evidence the intent of the Parties to comply with Article 1 IA and Article 40 of North Carolina General Statute Chapter 66. <br /> 12.10 Iran Divestment and Israel Boycott <br /> 12.10.1 Designer certifies that, as of the date listed below, it is not on the Final Divestment List as created by the State Treasurer <br /> pursuant to N.C.G.S. § 147-86.58 or the final boycott list created by the State Treasurer pursuant to N.C.G.S. §147-86.81 nor shall <br /> Designer utilize in the performance of this Agreement any subconsultant or consultant identified on such lists. <br /> 12.11 List of Attachment and Referenced Documents and Priority <br /> 12.11.1 The design documents consist of this Agreement and the attached and referenced documents. The attachments and referenced <br /> documents are listed in this Section 12.11.1 and are incorporated herein and made part of this Agreement by reference. In the event of any <br /> inconsistency between or among the terms of this Agreement and any of the incorporated listed documents such inconsistency or conflict <br /> shall be interpreted in the following order of priority: <br /> This Agreement <br /> Attachment A-Description of the Project <br /> Attachment B -Description of Basic Services <br /> Attachment C-Format of Total Project Cost Estimate(s) (Not applicable. Designer will not be submitting <br /> total project cost estimates.) <br /> Attachment D -Key Milestone Listing <br /> Attachment E- Consultants and Key Personnel <br /> Attachment F-Hourly Rates Schedule <br /> Request for Qualifications <br /> 14 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.