Browse
Search
Agenda 11-18-2025; 8-m - Approval of Master Plan Amendment – Blackwood Farm Park
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-m - Approval of Master Plan Amendment – Blackwood Farm Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:05:38 PM
Creation date
11/13/2025 3:09:13 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-18-2025 Business Meeting
ORD-2025-037-Unified Development Ordinance Text Amendments –Impervioius surfaces watershed protection
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-097-Statement of Inconsistency of a Proposed Zoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-099-White Cross Fire Truck Financing and Authorization for the Chair to Execute Required Documents
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-036-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-037-Abolition Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-059- North Carolina Governor’s Highway Safety Program – Orange County Sheriff’s
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Blackwood Farm Park — Phase 2-13 <br /> Proposed Improvements and Amenities (existing funds) <br /> Item Reason Projected Comments <br /> Cost <br /> Picnic Shelter w/ Move away from New Hope Church Road, address $400,000 Will need septic and water <br /> restrooms, outdoor high demand shelter use. Serve as "bridge" facility (see below) <br /> learning area and until Nature Center. Terraced grass seating. <br /> storage Securely store donated historic farm implements. <br /> Water line, water Septic field for restrooms at new shelter. Water $180,000 Requires new septic field and <br /> fountain, septic loop required with fountain/filling station. water line expansion ToH <br /> Disc Golf Course Originally in Phase 2-13. Redesigned to avoid bird $80,000 Mix of contracted work and <br /> habitat, clear path and create holes. staff/volunteer improvements. <br /> Enlarge pollinator Select locations and install. Assure visibility for $10,000 Will need limited ongoing <br /> habitat areas, prairie patrons. maintenance. <br /> restoration <br /> Lighting Path from parking lot to amphitheatre. Solar. $25,000 Explore solar options <br /> Fencing Around cemetery to protect and preserve $15,000 Wooden split-rail fence <br /> Nature Play area Select layout and natural play materials, install $40,000 Use existing vegetation and <br /> near Discover Trail? material where can <br /> Agricultural Exhibit Location for educational opportunities about crop $10,000 Committee with S&W and <br /> Area and animal management (sheep shearing, etc. Extension to define uses <br /> A/E and Contingency $140,000 Design, engineering, etc. <br /> TOTAL $900,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.