Orange County NC Website
10 <br /> FORMA OF PROPOSAL <br /> 2. STRUCTURAL FILL This Work shall consist of furnishing all materials, labor, equipment, and <br /> appurtenance necessary to complete structural fill required to achieve subgrade. Cost shall <br /> include placement of excavated material within the Work as structural fill. Payment for this item <br /> shall be made on a unit price basis, wherein measurement will be made by certified survey paid <br /> by the Contractor. <br /> 3. ASPHALT PAVING: This work shall consist of furnishing all materials, labor, equipment, and <br /> appurtenances necessary to construct paved surfaces. Work to include asphalt aggregate course, <br /> prepared surface, tack coat, prime coat. Payment for this item shall be made on a unit price <br /> basis, wherein measurement will be made by survey. Pavement thickness shall be per the <br /> standard detail on Sheet <br /> 4. AGGREGATE BASE COURSE: This work shall consist of furnishing all materials, labor, equipment, <br /> and appurtenances necessary to construct aggregate roads and other areas. Work to include <br /> prepared surface and aggregate. Payment for this item shall be made on a unit price. Basis <br /> wherein measurement will be made by survey. <br /> UNIT COST DEVIATIONS <br /> The Contractor is responsible for providing Unit Prices consistent with typical industry norms for the Work. <br /> described. Unit Prices which appear inconsistent with typical prices for similar Work shall be justified by the <br /> Contractor at the request of the Engineer. Providing Unit Prices which do not reasonably reflect the Work <br /> described, either high or low, which are not justified satisfactorily to the Engineer; may deem the BIDDER <br /> non-responsive and invalidate their Bid. <br /> All items must be completed to be considered a responsive bid. Unit Prices have been computed in <br /> accordance with the General Conditions. <br /> Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of <br /> comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, <br /> determined as provided in the contract Documents. <br /> ��General Subcontractor: p Plumbing Subcontractor: <br /> li n u Wig _ Lic_ <br /> Mechanical Subcontractor: Electrical Subcontractor: <br /> Lic Uka� roils _-�edric Lic <br /> GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of <br /> work. A contractor whose bid is accepted shall not substitute any person as subcontractor in the place of the <br /> subcontractor listed in the original bid, except (i) if the listed subcontractor's bid is later determined by the <br /> contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br /> contract for the complete performance of the bid work, or(ii)with the approval of the awarding authority for <br /> good cause shown by the contractor. <br /> Attendant Booth Additions TRC PN: 670493 <br /> Orange County, North Carolina Addendum #3 -SEPTEMBER 2025 <br /> BF-5 <br />