Browse
Search
Agenda 11-18-2025; 8-g - Award of Bid for Installation-Replacement of Booths at Solid Waste & Recycling Centers and Approval of Budget Amendment #4-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-g - Award of Bid for Installation-Replacement of Booths at Solid Waste & Recycling Centers and Approval of Budget Amendment #4-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:04:17 PM
Creation date
11/13/2025 3:09:11 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-18-2025 Business Meeting
ORD-2025-037-Unified Development Ordinance Text Amendments –Impervioius surfaces watershed protection
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-097-Statement of Inconsistency of a Proposed Zoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-099-White Cross Fire Truck Financing and Authorization for the Chair to Execute Required Documents
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-036-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-037-Abolition Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-059- North Carolina Governor’s Highway Safety Program – Orange County Sheriff’s
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> FORMA OF PROPOSAL <br /> 2. STRUCTURAL FILL This Work shall consist of furnishing all materials, labor, equipment, and <br /> appurtenance necessary to complete structural fill required to achieve subgrade. Cost shall <br /> include placement of excavated material within the Work as structural fill. Payment for this item <br /> shall be made on a unit price basis, wherein measurement will be made by certified survey paid <br /> by the Contractor. <br /> 3. ASPHALT PAVING: This work shall consist of furnishing all materials, labor, equipment, and <br /> appurtenances necessary to construct paved surfaces. Work to include asphalt aggregate course, <br /> prepared surface, tack coat, prime coat. Payment for this item shall be made on a unit price <br /> basis, wherein measurement will be made by survey. Pavement thickness shall be per the <br /> standard detail on Sheet <br /> 4. AGGREGATE BASE COURSE: This work shall consist of furnishing all materials, labor, equipment, <br /> and appurtenances necessary to construct aggregate roads and other areas. Work to include <br /> prepared surface and aggregate. Payment for this item shall be made on a unit price. Basis <br /> wherein measurement will be made by survey. <br /> UNIT COST DEVIATIONS <br /> The Contractor is responsible for providing Unit Prices consistent with typical industry norms for the Work. <br /> described. Unit Prices which appear inconsistent with typical prices for similar Work shall be justified by the <br /> Contractor at the request of the Engineer. Providing Unit Prices which do not reasonably reflect the Work <br /> described, either high or low, which are not justified satisfactorily to the Engineer; may deem the BIDDER <br /> non-responsive and invalidate their Bid. <br /> All items must be completed to be considered a responsive bid. Unit Prices have been computed in <br /> accordance with the General Conditions. <br /> Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of <br /> comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, <br /> determined as provided in the contract Documents. <br /> ��General Subcontractor: p Plumbing Subcontractor: <br /> li n u Wig _ Lic_ <br /> Mechanical Subcontractor: Electrical Subcontractor: <br /> Lic Uka� roils _-�edric Lic <br /> GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of <br /> work. A contractor whose bid is accepted shall not substitute any person as subcontractor in the place of the <br /> subcontractor listed in the original bid, except (i) if the listed subcontractor's bid is later determined by the <br /> contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br /> contract for the complete performance of the bid work, or(ii)with the approval of the awarding authority for <br /> good cause shown by the contractor. <br /> Attendant Booth Additions TRC PN: 670493 <br /> Orange County, North Carolina Addendum #3 -SEPTEMBER 2025 <br /> BF-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.