Browse
Search
Agenda - 02-26-2003-ws1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 02-26-2003
>
Agenda - 02-26-2003-ws1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 9:08:07 AM
Creation date
8/29/2008 10:44:43 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2003
Document Type
Agenda
Agenda Item
ws1
Document Relationships
Minutes - 20030226
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 11/21/0I0 <br />!~ <br />ORANGE COUNTY <br />Policy on Planning and Funding School Capital Projects <br />(This document is inte~aded to clarify the expectations of the Ora~age County Board of Commissioners in <br />collaborating with the Boards of Education in planning for and implementing school capital projects) <br />1. Background <br />The County's ten year capital investment plan is a planning document that is updated annually. <br />Before the beginning of each fiscal year, the Board of County Commissioners approves the <br />funding plan in concept. However, funding of individual projects is contingent upon the scope <br />of work required to complete the project. <br />Level 1 Projects: Level one projects are those projects that have a relatively small scope <br />of work and can be accomplished using a single prime contractor, in-house staff or entail <br />purchasing equipment and vehicles. Specific examples of Level 1 projects include <br />roofing projects, parking lot paving and re-wiring of existing buildings. The Board <br />approves the entire project ordinance at one time. <br />• Leve12 Projects: Level two projects are major projects that require several phases to <br />complete. For these projects, the Board of County Commissioners approves afour-phase <br />appropriation process to include: <br />• Concept/Pre-Planning Phase (includes preliminary programming and design work <br />that would result in conceptual drawings and preliminary cost estimates. <br />• Planning Phase (including siting & infrastructure) <br />• Design and Construction Approval Phase (including final design, equipment, <br />furnishings, non-recumng start up, technology, contingency) <br />^ Schools have the latitude to shift funds between major components without <br />prior BOCC approval, providing that the actual cost of the project does not <br />exceed budget. <br />^ Superintendents will provide the County Manager with written project <br />updates at their regular monthly meetings. In turn, the County Manager will <br />provide the Board of County Commissioners with written progress reports <br />related to the project. <br />Final Accounting Phase <br />^ Upon completion of the project, School and County staff will reconcile actual <br />project expenditures with approved budget and provide the BOCC with a <br />"final accounting" of project. <br />Page 1 of 6 <br />Policy on Planning and Funding School Capital Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.