Orange County NC Website
215 <br /> DRAFT <br /> 657 Beth Trahos: Likely a builder- <br /> 658 <br /> 659 Charity Kirk: —that's going to build. <br /> 660 <br /> 661 Beth Trahos: —would build the— <br /> 662 <br /> 663 Beth Bronson: Yeah,the builder. <br /> 664 <br /> 665 Beth Trahos: —individual homes and sell them to a homeowner. <br /> 666 <br /> 667 Beth Bronson: Yes. <br /> 668 <br /> 669 Beth Trahos: But in the development process, all that will be done is to input the roads and provide a buildable <br /> 670 area for a house and for a septic field. <br /> 671 <br /> 672 Charity Kirk: So you're doing that? <br /> 673 <br /> 674 Beth Trahos: Yes,the developer does that. Yes, ma'am. <br /> 675 <br /> 676 Charity Kirk: Okay. <br /> 677 <br /> 678 Beth Bronson: And you're saying that that's going to average about 29-30 acres? <br /> 679 <br /> 680 Beth Trahos: That's all that's available, right? <br /> 681 <br /> 682 Don Sever: That's all that's available. <br /> 683 <br /> 684 Beth Bronson: Okay. <br /> 685 <br /> 686 Beth Trahos: So not all of that would be cleared, but that is, could be— <br /> 687 <br /> 688 Beth Bronson: So less, yeah, 29 or less. <br /> 689 <br /> 690 Beth Trahos: Yeah. <br /> 691 <br /> 692 Taylor Perschau: If I may- <br /> 693 <br /> 694 Beth Bronson: Thank you. <br /> 695 <br /> 696 Taylor Perschau: —I think it might be helpful for answering this, actually, so when we're talking about clearing, and <br /> 697 this might help you get a different answer too, Don, but land clearing when we're talking about <br /> 698 right now a concept plan,the acreage of disturbance would be calculated with the construction <br /> 699 drawing set. This project will be considered a common plan of development. And it will require a <br /> 700 stormwater management plan. If we have questions on that,we can ask the county engineer. <br /> 701 That's usually the point at which the acreage for clearing,the erosion control plans,and the <br /> 702 construction set, and the stormwater management plan are brought in. So the 29 acres is not, I'm <br /> 703 not the developer, but that wouldn't be my answer. If I were a developer, I think this, like the <br /> 704 answer that's appropriate for the developer is the clearing plan for the road at the moment, and <br /> 705 then of course in that, since they've answered for,they'll be responsible for clearing for septic. <br /> 706 Septic clearance is not calculation in the land-disturbance calculations that go towards erosion <br /> 707 control and stormwater considerations. <br /> 708 <br /> 709 Liz Kalies: Okay. <br /> 710 <br /> 711 Beth Trahos: Yeah. <br />