Browse
Search
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:01:27 PM
Creation date
11/13/2025 3:09:05 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-18-2025 Business Meeting
ORD-2025-037-Unified Development Ordinance Text Amendments –Impervioius surfaces watershed protection
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-097-Statement of Inconsistency of a Proposed Zoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-099-White Cross Fire Truck Financing and Authorization for the Chair to Execute Required Documents
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-036-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-037-Abolition Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-059- North Carolina Governor’s Highway Safety Program – Orange County Sheriff’s
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
161 <br /> - <br /> > <br /> w3M aP <br /> - N.j6•�•29 W Rl7E LINES 9983 rt'W <br /> 48 GRIP G'ISTAxCE 396,56 <br /> (. 3 • . <br /> W16 <br /> iANLEN LASEMENI - <br /> y63840 <br /> N �`1.`V SiW SIVY <br /> - a.T6'sdu 1+ <br /> . orsuxcE nsoxlu3 - <br /> � <br /> 1l <br /> \V PgWFR13' <br /> l]�} VV J q,A�`V F ERAR,P 6Rp1YN t — B]LN6ARY <br /> T' l 1 xERµ6 Vy 1l Pix R4®fi59F- - <br /> OB 13fi PC )2 , PRbPERtt t <br /> ZONING–AR 6xPfER <br /> €57 1Ary REsioENCE i <br /> 966_5653]33 V ` ,� <br /> 6s'pG 5 1 <br /> T9 PG I A I IN• - }5 <br /> s1'l 35OA l', <br /> 0' <br /> -,NI <br /> P%-"U E <br /> SPo w <br /> RunoR I Y'p LLO <br /> P➢96 99658�, V 1:;\ - � ` " 5 °u <br /> ZOIdINLPG IRR6 ' VVl l 0.51 AG 8 8'MAuA, <br /> RESPENCE ,`, � I '6t•w e, � 9 [ <br /> 4. The trip generation report indicates that a total of 524 trips per day will be generated <br /> with about 39 vehicles exiting the development at peak in the AM and 32 coming in <br /> at peak in the PM for 49 units. <br /> While this does not meet the threshold for the preparation of a TIA(traffic impact <br /> analysis)for the County, if this project were being developed in town we would <br /> require both the intersection of NC57 & NC 86N and NC HWY 70 & NC 86N be <br /> studied under the requirement: "staff or NCDOT identify potential negative impacts <br /> to nearby intersections with high crash rates, significant turning movement delays, <br /> or level of service concerns." <br /> These intersections both have poor levels of service at peak operation.The Town <br /> would encourage that the Orange County Planning Board and BOCC ask the <br /> developer to study how these additional trips per day will further add delays to <br /> already failing intersections and make any suggestions for improvements with <br /> rational nexus to the size of the development. <br /> Water&Sewer Service <br /> 5. The plans indicate that septic will be provided on-site via septic tanks and drain <br /> fields, however no drain fields are shown on the subdivision plan.Where are the <br /> drain fields proposed to be located?On the individual lots themselves? <br /> A. These lots are only .5 acres, has Enivronmental Health or the developer <br /> confirmed that such a small lot can support a house, septic tank, and drain <br /> field area in such a small space? <br />
The URL can be used to link to this page
Your browser does not support the video tag.