Orange County NC Website
156 <br /> c.Note the maximum impervious surface is N/A for the Lower Eno Unprotected Watershed. <br /> Forestar Response: Noted. It is indicated in the data table (Sheet C1.0). <br /> d. Please include a note on the site plan detailing the traffic generation that was provided <br /> in the Traffic Study prepared by Bolton & Menk. <br /> Forestar Response: Noted. It is indicated in the data table (Sheet C1.0). <br /> e. Development Data tables details "No requirement" for all setbacks; Sheet C3.0 details <br /> 20' front, 15' rear, and 10' side setbacks in the typical lot layout as well as on Lot 20. Please <br /> confirm whether these are to be considered the proposed minimum lot setbacks. <br /> Forestar Response: Noted. Data table indicates proposed minimum lot setbacks in accordance <br /> with sheet C3.0. <br /> f. Common Open Space consists of both primary open space and secondary open space. Please <br /> identify these areas (primary vs. secondary) and provide total acreages of both. This is to <br /> include a clear delineation of the primary and secondary open space boundaries as well as a <br /> description of how the areas will be used (passive, active, natural/undisturbed, trails, <br /> recreational amenities, etc.), as well as the ownership designation. <br /> Forestar Response: Existing primary and secondary open space has been identified on sheet <br /> C2.1 and preserved or proposed open space with descriptions is shown on 1-000. <br /> g.For any amenities, provide a graphic representation of the proposed improvement. Forestar <br /> Response: A separate precedent imagery document has been included in the submittal to <br /> show examples of the design intent for amenity and open space areas. <br /> h. Please confirm the length of the riparian buffers being proposed. Buffers vary <br /> depending on slop calculated on site per UDO Section 6.13. Note that, where applicable, the <br /> calculated buffer is applied to the 100-year floodplain rather than the edge of stream. <br /> Forestar Response: Buffers were calculated on site per UDO Section 6.13. A buffer applicability <br /> memo is provided demonstrating how the buffers were calculated. <br /> i. Please confirm whether any lighting or signage is being proposed. <br /> Forestar Response: Proposed signage and lighting are shown in the site plan (Sheet 3.0). <br /> j. Please identify fire and police service providers. <br /> Forestar Response: Fire and police service providers are listed in the cover sheet (Sheet C1.0). <br /> k. Please confirm the proposed solid waste disposal services. <br /> Forestar Response: We have reached out to Orange County Waste Management in hopes of <br /> receiving a will serve letter. Once we receive correspondence from OC Waste Management, <br /> we will send that information on to Orange County Planning staff. <br /> 7. Please relabel the "50' lot setback" to be "50' development setback" for clarity in differentiating <br /> lot setbacks with overall subdivision development setback. <br /> Forestar Response: "Development setback" was relabeled in the Site plan (Sheet C3.0). <br />