Browse
Search
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:01:27 PM
Creation date
11/13/2025 3:09:05 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-18-2025 Business Meeting
ORD-2025-037-Unified Development Ordinance Text Amendments –Impervioius surfaces watershed protection
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-097-Statement of Inconsistency of a Proposed Zoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-099-White Cross Fire Truck Financing and Authorization for the Chair to Execute Required Documents
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-036-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-037-Abolition Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-059- North Carolina Governor’s Highway Safety Program – Orange County Sheriff’s
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
155 <br /> 2. The R-CD rezoning process is intended to be used for the purpose of binding development to a <br /> detailed site plan with a list of specific conditions that ensure compatibility and harmony with <br /> the surrounding areas. If conditions of approval are being proposed, please provide a draft for <br /> staff to review. <br /> Forestar Response: Understood. We will be providing conditions for staff to review. <br /> Application <br /> 3. Narrative refers to Central Orange Coordinated Area Land Use Plan as COCO, please note that <br /> staff will refer to this land use plan as COCA in the staff report and presentation. <br /> Forestar Response: Thank you for the clarification. We have revised our statement to refer the <br /> COCA, as well. <br /> 4. Per UDO Section 5.21.1, since the proposed lots are to be served by community well, a <br /> professionally prepared groundwater yield analysis relating the proposed well to the U.S. <br /> Geological Water Resources Investigation Report 00-4286 and any later USGS Water Resource <br /> Investigation Report data available is required for submittal. <br /> Forestar Response: The well was drilled by Yadkin Well Company. The 24-hour draw down was <br /> performed on 11/19/2024 producing 84 GPM at 554 feet. The full report is included in the <br /> resubmittal package. <br /> 5. Per UDO Section 5.21.1, a written and graphic site analysis illustrating soils, depth to water <br /> table, slope, hydrology, vegetation, natural areas and habitats of special concern, infrastructure <br /> and other constructed features, historic and archaeological sites, and visual analysis of views <br /> into and from the site is required for submittal. <br /> Forestar Response: Natural and human resources report is provided illustrating soils, depth to <br /> water table, slope, hydrology, vegetation, natural areas and habitats of special concern, <br /> infrastructure and other constructed features, historic and archaeological sites, and visual <br /> analysis of views into and from the site. This report has been included in the resubmittal <br /> package. <br /> Site Plan <br /> 6. Per UDO Section 2.5.3 Site Plan Specifications and UDO Section 5.21.1 Major Subdivision <br /> Standards for Conditional Districts, please include or correct the following elements in the site <br /> plan set. This may be on the site plan itself or as a note, condition, or explanation in the <br /> narrative. <br /> a.Development Data on Sheet C1.0 incorrectly lists R1 as the current zoning; revise to AR— <br /> Agricultural Residential <br /> Forestar Response: Noted. C1.0 sheet is now listing AR as the current zoning. <br /> b. Please revise Development Data Table to clearly indicate the "Minimum Building <br /> Setbacks" are the proposed, rather than setbacks associated with current zoning. <br /> Forestar Response: Noted. Data table indicates "Minimum Proposed Building Setback". <br />
The URL can be used to link to this page
Your browser does not support the video tag.