Browse
Search
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:07:02 PM
Creation date
11/13/2025 2:53:58 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74 <br /> LEGAL ACTION IN THE LAST 5 YEARS <br /> In the past five (5) years, O'Brien Atkins Associates has not had any legal claims, <br /> including litigation and arbitration. <br /> RECORD OF SUCCESSFUL COMPLETION WITHOUT LEGAL/TECHNICAL PROBLEMS <br /> A proven track record of high profile, public projects successfully delivered in the <br /> Greater Triangle Region of North Carolina includes: <br /> • Wake County Public Health Building (in construction) <br /> • Wake County Justice Center (LEED° Silver) <br /> • Durham County Administration Building II (LEED° Silver) <br /> • Durham County Courthouse (LEED° Gold) <br /> • NC State Lab for Public Health and Office of the Chief Medical Examiner <br /> • RDU Terminal 2 -Associate Architect to Fentress Architects <br /> • Raleigh Civic and Convention Center (LEED° Silver) <br /> FINANCIAL CAPACITY <br /> O'Brien Atkins has the financial stability and operational resources necessary to <br /> complete this project successfully and without interruption. <br /> The firm has maintained a strong financial position over the past 50 years. Our <br /> internal accounting controls, long-standing client relationships, and history of <br /> successful project delivery, many of which are similar or larger in scale and <br /> complexity, demonstrate our capacity to support this project from initiation through <br /> completion. We have successfully delivered projects exceeding $200 million in <br /> construction cost and are confident in our ability to perform the tasks outlined in the <br /> Request for Qualifications. <br /> Upon request, we can provide a letter from our primary banking institution attesting <br /> to our financial standing as well as certificates of insurance showing that we carry <br /> all required coverage. <br /> + SLAM 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.