Orange County NC Website
OBIA O'Brien/Atkins Associates, PA 6 <br /> o'BPIEN ATKINs Architecture I Engineering I Landscape Architecture I Planning I Interiors <br /> F. We will create two (2) Renderings for use in promotional presentations. <br /> G. Design team will produce As-Built drawings at the end of the project based on Contractor mark- <br /> u ps. <br /> 4. Proposed Schedule <br /> • Pre-Design/Programming phase—2 months <br /> • Schematic Design—2 months <br /> • Design development—3 months <br /> • Construction documents—S months <br /> • Bidding support- 1 month <br /> • Construction Administration—18 Months <br /> • Close out—1 month <br /> Total: 33 Months <br /> S. Proposed Team <br /> • Project Management—O'Brien Atkins Associates <br /> • Civil—Stewart Engineering <br /> • Landscape -O'Brien Atkins Associates <br /> • Architecture-O'Brien Atkins Associates/SLAM Collaborative <br /> • Interior Design - O'Brien Atkins Associates <br /> • Structural—Stewart Engineering <br /> • Mechanical, Electrical, Plumbing Engineering- O'Brien Atkins Associates <br /> • Telecom, Security,Audio Visual—J&A Engineering <br /> 6. Clarifications <br /> A. Cost for Geotech and survey services are not included in this proposal <br /> B. It is unknow at this time how much of the link building can be re-used. Early in Pre-Design the <br /> Design team will evaluate the building for re-use. <br /> C. Since we are planning on removing the envelope of the Link Building,we have removed the <br /> Industrial Hygienist and the Envelope Consultants to reduce the fee. <br /> D. Cost Estimating services are not provided with the assumption that this will be provided by the <br /> CMAR and reviewed by the design team. If the County would like an independent cost <br /> consultant we can add team to the team for an additional cost. <br /> E. Fees were put together with the assumption that both projects would be developed at the same <br /> time and Constructed on a similar time frame. Our schedule assumed an 18 month construction <br /> schedule. If the construction phase goes beyond the allotted time we could ask for an additional <br /> service if needed. <br /> Post Office Box 12037 1 Research Triangle Park, NC 127709 <br /> 919.941.9000 1 www.obrienatkins.com <br /> P14 <br />