Orange County NC Website
30 <br /> DEFINITIONS <br /> Item on Form Definition <br /> CURRENT ESTIMATED Attach basis and justification for estimate. Include description, <br /> CONSTRUCTION COST quantities,units, special features, similar cost on recent projects, etc. <br /> A. 1. Demolition Includes but may not be limited to lead or asbestos testing and <br /> removal,building or interior space demolition in whole or part. <br /> Includes but may not be limited to grading, excavating,poor soils or <br /> A. 2. Site Work rock removal,utilities relocation,roads,walks,parking, streambank <br /> repairs, stormwater management,retaining walls,rainwater harvesting <br /> systems, landscaping. <br /> Attach explanation of any special building,mechanical, or electrical <br /> B. 1. Utility Services service requirements with appropriate distance to existing buildings, <br /> water, gas, electrical or other utility service. <br /> B. 9. Associated Construction Includes but may not be limited to construction fire alarm testing, <br /> Costs utility shut downs,utilities, signage, security, displaced parking, <br /> staging,lock cores,keys,permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. <br /> Additional lines may be added if needed. <br /> Includes but may not be limited to land surveys,lead/asbestos <br /> PRECONSTRUCTION surveys, environmental assessments, copying,postage,costs of print <br /> COSTS advertising, and destructive testing. For CM at Risk,preconstruction <br /> costs are consistent with the requirements of the preconstruction <br /> services agreement. <br /> Unanticipated or unforseen conditions including but not limited to <br /> CONTINGENCIES design error and omissions, concealed site conditions,utility conflicts, <br /> and extended overhead resulting from weather or other delay. <br /> 22 <br /> Revised 01/24 <br />