Browse
Search
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:07:02 PM
Creation date
11/13/2025 2:53:58 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br /> DEFINITIONS <br /> Item on Form Definition <br /> CURRENT ESTIMATED Attach basis and justification for estimate. Include description, <br /> CONSTRUCTION COST quantities,units, special features, similar cost on recent projects, etc. <br /> A. 1. Demolition Includes but may not be limited to lead or asbestos testing and <br /> removal,building or interior space demolition in whole or part. <br /> Includes but may not be limited to grading, excavating,poor soils or <br /> A. 2. Site Work rock removal,utilities relocation,roads,walks,parking, streambank <br /> repairs, stormwater management,retaining walls,rainwater harvesting <br /> systems, landscaping. <br /> Attach explanation of any special building,mechanical, or electrical <br /> B. 1. Utility Services service requirements with appropriate distance to existing buildings, <br /> water, gas, electrical or other utility service. <br /> B. 9. Associated Construction Includes but may not be limited to construction fire alarm testing, <br /> Costs utility shut downs,utilities, signage, security, displaced parking, <br /> staging,lock cores,keys,permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. <br /> Additional lines may be added if needed. <br /> Includes but may not be limited to land surveys,lead/asbestos <br /> PRECONSTRUCTION surveys, environmental assessments, copying,postage,costs of print <br /> COSTS advertising, and destructive testing. For CM at Risk,preconstruction <br /> costs are consistent with the requirements of the preconstruction <br /> services agreement. <br /> Unanticipated or unforseen conditions including but not limited to <br /> CONTINGENCIES design error and omissions, concealed site conditions,utility conflicts, <br /> and extended overhead resulting from weather or other delay. <br /> 22 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.