Browse
Search
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:07:02 PM
Creation date
11/13/2025 2:53:58 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> Attachment C-Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C---Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or <br /> LOCATION: <br /> (Definitions/explanations are provided on pg 2 to assist in <br /> completion of this form.) <br /> CURRENT ESTIMATED COST PER <br /> CONSTRUCTION COSTS QTY UNIT UNIT TOTAL <br /> A. Site Preparation <br /> 1. Demolition $0 <br /> 2. Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4. Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6. Electrical(Includes TV&Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone,Data,Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1. Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. If using lump <br /> sum,make entry in$field. <br /> DESIGN FEE % (% of Estimated Construction Costs) $0 <br /> PRECONSTRUCTION <br /> COSTS % (% of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (% of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est. Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %) $0 <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> 20 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.