Orange County NC Website
14 <br /> 5.1.8 Designer, and its Consultants if necessary, shall attend special public hearings for the Project, other than those listed herein,which <br /> are called by the Board of County Commissioners. <br /> ARTICLE 6 <br /> DURATION OF DESIGNER'S SERVICES <br /> 6.1 Scheduling of Services <br /> 6.1.1 Attachment D to this Agreement is the Key Milestone Listing which defines the sequence and timing of the design and <br /> construction activities. The Designer and its Consultants shall schedule and perform their activities so as to meet the Milestone Dates <br /> shown except for deviations not caused by Designer or its Consultants.No deviation by the Designer or his Consultants from the Key <br /> Milestone Listing shall be allowed without prior written approval by the Owner. <br /> 6.1.2 The Designer's schedule for the performance of its activities and the activities of its Consultants shall be in accordance with the <br /> outline in Attachment D. The Owner shall always have a reasonable time within which to provide such item of information, approval or <br /> decision and Owner and Designer shall not have any responsibility for any delay occurring by reason of the Owner's being unable,through <br /> no fault of the Owner,to supply such item of information, approval or decision. <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its <br /> efforts, including providing additional manpower or overtime, as necessary,to perform its services in accordance with the Key Milestone <br /> Listing at no additional cost to the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully <br /> executed original of this Agreement. <br /> 6.2 Adjustments to the Schedule <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty(60)days through no fault of the Designer, or if the <br /> Owner increases or decreases the scope or size of the Project by ten percent(10%) of currently estimated Total Project Cost,the Designer <br /> shall give prompt written notice to the Owner. Provided that such notice has been given,the Designer may request in writing an <br /> adjustment in the Key Milestone Listing dates,which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for the Services under this <br /> Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> 6 <br /> Revised 01/24 <br />