Browse
Search
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-n - Approval of a Contract with O’Brien Atkins for Design and Engineering Services for the Renovation of the Link Center and the Sheriff’s Office Evidence Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:07:02 PM
Creation date
11/13/2025 2:53:58 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> ARTICLE 2 <br /> DEFINITIONS <br /> 2.1 Definitions <br /> 2.1.1 Additional Services—Those services to be performed by Designer pursuant to this agreement beyond the Basic Services. See <br /> Section 1.1.4 and Article 5. <br /> 2.1.2 Basic Services—Those services to be performed by Designer as outlined in Attachment B. See Article 4 and Attachment B. <br /> 2.1.3 Compensation for Basic Services—Those fees to be paid by Owner for Basic Services. See Section 7.1 and 7.2. <br /> 2.1.4 Contractor—The construction contractor(s) engaged by Owner to construct the Project. <br /> 2.1.5 Consultants—Subconsultants,partners and other entities engaged by Designer to work with or on behalf of the Designer. See <br /> Section 3.3.1 and Attachment E. <br /> 2.1.6 Board of County Commissioners-The Board of Commissioners of Orange County,North Carolina. <br /> 2.1.7 County Manager-The Orange County employee bearing that title. <br /> 2.1.8 Milestone Dates—Those dates where certain results are expected. See Attachment D. <br /> 2.1.9 Project-All phases of the Project as described in Section 1.1.1 and Attachments A and B to be performed by Designer including <br /> but not limited to the schematic design, design development, construction document,bidding and contract award, construction and post- <br /> construction phases. <br /> 2.1.10 Reimbursable Expenses—Those costs incurred by the Designer for the benefit of this project and which the County will pay as <br /> provided in Section 7.5. <br /> 2.1.11 Total Project Cost—The total amount of money which maybe paid for Services on this project. See Section 4.2.1. <br /> ARTICLE 3 <br /> RESPONSIBILITIES OF THE DESIGNER <br /> 3.1 Services to be Provided. <br /> 3.1.1 The Designer shall provide the Owner with all professional services required to satisfactorily complete all phases of the Services <br /> within the time limitations set forth herein and in accordance with the applicable professional standards. Such services are as shown in <br /> Attachment B,the description of Services. <br /> All Services of the Designer shall be provided in accordance with the terms and conditions of this Agreement. <br /> 3.2. Standard of Care <br /> 3.2.1 The Designer and its Consultants shall exercise reasonable care and diligence and shall perform its Services consistent with the <br /> professional skill and care ordinarily provided by designers practicing in the same or similar locality under the same or similar <br /> 2 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.