Browse
Search
Agenda 11-18-2025; 8-h - Purchase of Equipment for Solid Waste Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 8-h - Purchase of Equipment for Solid Waste Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:04:37 PM
Creation date
11/13/2025 2:51:28 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Carolina Environmental Systems, Inc. <br /> 306 Pineview Dr, Kernersville, NC 27284 <br /> (336) 869-9900 <br /> 10-15-25 Corrected <br /> To: Orange County Solid Waste <br /> Attn: Jamie Rogers, Danny Crouse Western Star model 47XSB <br /> Ref: Swaploader quote NC Sheriffs Association contract #26-10-0422 item 1987 <br /> Hoist: <br /> New SwapLoader hook lift hoist model SL650 <br /> 65,000 lbs lift and dump capacity <br /> Handles 20' to 24' long bodies <br /> 62"hook height <br /> Double pivot design <br /> Slide thru body locks <br /> Dump angle 54 degrees <br /> 3,500 PSI operating pressure <br /> All SAE fittings, standard gear pump and valves <br /> Hoist dry weight 8,050 lbs. <br /> Hydraulic oil tank 30 gallons <br /> Heavy duty rear bumper with LED lighting <br /> Inside air controls <br /> Hucks bolts used on mounting <br /> Electric shift PTO with EOS and pump <br /> Four work lights <br /> Delivery to you <br /> Hoist freight, CES mounting and finish coat of paint. <br /> Base hoist cost $ 93,983.00 <br /> Rear roller spacers 425.00 <br /> One spare rear rim, aluminum 530.00 <br /> Rear tubular bumper extension N/C <br /> Pioneer Rack N Pinion tarp system, installed 11,700.00 <br /> Aluminum tool box 36" x 18" x 18" upgrade 800.00 <br /> Aluminum tri axle fenders upgrade 2,120.00 <br /> Hoist subtotal $ 109,558.00 <br /> Less discount 6% (6,573.00 ) <br /> Hoist total $ 102,984.00 <br /> Chassis: VIA Velocity NCSA contract 26-10-0422, item 664 <br />
The URL can be used to link to this page
Your browser does not support the video tag.