Orange County NC Website
9 <br /> FORM OF PROPOSAL <br /> 6. ATTENDANT BOOTH PROCUREMENT AND DELIVERY FERGUSON ROAD—This work shall consist <br /> of procurement and delivery of one (1) 6'x8'x8' Attendant Booth to the Ferguson Road Waste <br /> & Recycling Center. Payment for this line item shall be made under a one-time charge and will <br /> constitute full compensation for procurement and deliver of the booths to the project site. <br /> 7. ATTENDANT BOOTH INSTALLATION FERGUSON ROAD —This work shall consist of furnishing all labor, <br /> material, equipment,tools and other items necessary and incidental to install one (1) 6'x8'xB' <br /> Attendant Booth, and install three (3) bollards as indicated in the Drawings at the Ferguson Road <br /> Waste& Recycling Center. Installation shall also consist of furnishing all labor, material, equipment, <br /> tools, permitting and other items necessary and incidental to trench the existing gravel lot to install <br /> electrical connections, including conduit and fasters, to the Attendant Booth, and the repair of the <br /> gravel lot to pre-construction conditions. Installation shall also consist of furnishing all labor, material, <br /> equipment, tools, permitting and other items necessary and incidental to ensure the booths are level <br /> and installed per the manufacturer's instructions. Payment for this line item shall be made under a <br /> one-time charge and will constitute full compensation for all labor, equipment,tools, and other items <br /> necessary and incidental to the completion of the work. <br /> 8, PULTRUDED FIBERGLASS ANTI-SLIP PIPE &CABLE COVER—This work shall consists of furnishing all <br /> labor, material, equipment, tools and other items necessary and incidental to install Pultruded <br /> Fiberglass Anti-Slip Pipe& Cable Cover over all exposed conduit on the walking surface. Use of this <br /> allowance shall be preapproved by the Engineer. Payment for this item shall be made on a unit price <br /> basis, as established by field measurements of final installation, <br /> 9. ATTENDANT BOOTH DELIVERY SCHEDULE—This time shall consist of the time necessary to order and <br /> deliver the attendant booths as specified for the project from Notice to Proceed.This item is not a pay <br /> item, rather it is an estimation of the time required to fully procure the Attendant Booths as identified <br /> in the Drawings. <br /> 10. ADDITIONAL: ELECTRICAL SYSTEM UPGRADES—This work shall consist of furnishing all labor, <br /> material, equipment, tools, and other items necessary and incidental to the installation of <br /> additional electrical supply should the electricity available at adjacent compactors be <br /> insufficient to adequately supply electricity to the newly installed attendant booths. Use of this <br /> allowance shall be preapproved by the Engineer. If this item is used during the project the <br /> Contractor shall provide an actual cost, itemized, breakdown of each item plus overhead and <br /> profit as described in the contract documents. Payment for this item shall be made under a <br /> one-time charge and will constitute full compensation for all labor,equipment, tools, and other <br /> items necessary and incidental to the completion of the work. <br /> UNIT RATE ITEMS: <br /> 1. EXCAVATION:This Work shall consist of furnishing all necessary materials, labor, equipment, and <br /> appurtenances necessary to excavate soil material at the site as approved by the Engineer, <br /> Progress payment will be made by truck/scrapper count or by a survey performed by the <br /> Contractor. The Owner may perform verification surveying at the Owner's expense. Payment for <br /> this item shall be on a unit price basis wherein measurement will be made by certified survey <br /> paid by the Contractor.The Owner and/or Engineer will make final judgment of the quantities. <br /> Attendant Booth Additions TRO PN: 670493 <br /> Orange County, North Carolina Addendum #3 - SEPTEMBER 2025 <br /> BF-4 <br />