Orange County NC Website
8 <br /> 1 mental health crises as well as those struggling with substance use and addiction. The current <br /> 2 design calls for sixteen (16) beds, the maximum allowed under current regulations. Through the <br /> 3 FBC services, individuals will receive assessment, treatment, 24-hour medical supervision, case <br /> 4 management, and group and individual therapy in a residential setting. Individuals will spend time <br /> 5 with clinicians and peer support specialists, both individually and in groups, to identify strengths, <br /> 6 individual support, and treatment needs, and to make a plan for recovery.An important part of the <br /> 7 treatment process is to prepare individuals to return home and arranging for further treatments so <br /> 8 that individuals can continue their path towards recovery. <br /> 9 <br /> 10 Coordinated Discharge and Resource Space—The original concept also included a peer living <br /> 11 area, a resource room with information about behavioral health resources, a large conference <br /> 12 room, and several offices for County staff to support the coordinated discharge planning for <br /> 13 patients of the Crisis Diversion Facility as well as resources to establish and maintain connections <br /> 14 in the community. <br /> 15 <br /> 16 Current Available Budget: <br /> Crisis Diversion Facility Budget <br /> Description Budget Spent/Encumbered Available <br /> Land $1,360,000.00 $1,353,265.54 $6,734.46 <br /> Professional Services $2,322,155.00 $2,035,272.00 $286,883.00 <br /> Construction $21,813,484.00 $179,928.00 $21,633,556.00 <br /> Equipment $557,711.00 $0.00 $557,711.00 <br /> Total: $26,053,350.00 $3,568,465.54 $22,484,884.46 <br /> 17 <br /> 18 Project Budget: <br /> 19 Gilbane, the Construction Manager at Risk, provided a budget estimate for the project in July <br /> 20 2025 of $25,700,000. However, that budget was incomplete as it did not include estimates for <br /> 21 furniture, fixtures and equipment (FFE), owner's contingency, or commissioning services. Given <br /> 22 the significant increase over the approved budget, the County asked CPL and Gilbane to provide <br /> 23 several options for reducing the scope of the facility. <br /> 24 <br /> 25 Please note that the cost figures below do not include the cost of land acquisition or professional <br /> 26 services, which have already been encumbered or spent. <br /> Original • • • Option <br /> • • • • • • • • • • • • <br /> D. • <br /> WMANi Total 22,405 10,080 10,275 17,575 15,850 16,000 15,000 19,825 <br /> Square Ft. <br /> Cost $28.2 $20.8 $21.5 $26.6 $25.4 $25.6 $24.9 $27.2 <br /> million million million million million million million million <br /> FBC Beds 16 8 8 8 16 16 16 16 <br /> 8 <br /> BHUC Bays 12 6 6 Expansion 12 12 6 12 <br /> Possible <br />