Orange County NC Website
13 <br /> 1 Slide #8 <br /> Original Design <br /> Current Project Budget Available - $22,484,884 <br /> Building Size — <br /> 22405 Sf ung;;. c _ <br /> Cost Estimate <br /> $28,190.991 <br /> FBC Beds: 16 -- <br /> BHUC Bays:12 <br /> (4 pediatric,8 Adult! — <br /> _ _ <br /> Duol-Side Entry <br /> FBC Requested Room Ca1.r1Y - — a 2 <br /> BHUC Requested BdY Gourd _ � <br /> FBC C—tyad <br /> Conference Spore <br /> Peer Living l� <br /> Resources tenter - <br /> County Offices/Discharge <br /> 2 <br /> 3 <br /> 4 Slide #9 <br /> Design Option A <br /> Reduce BHUC from 12 to 6 and FBC from 16 to 8 <br /> No coordinated discharge/resource space <br /> BNIIC <br /> Building Size y •, -- <br /> 10.080 51' �� e��� <br /> Cost Estimate <br /> 9 m; .. <br /> $2!,1,7.1,005 <br /> EE <br /> �- <br /> — <br /> Future CammunilY Addition - <br /> ..m ,., ,.,.e.. <br /> $842526 <br /> FBC Beds,8 I w <br /> BHUC Bays:b <br /> Wil_ L�IU <br /> 12 PedloM,4 Adult) <br /> DualSideEntry <br /> FBC Requested Room Count <br /> BHUC Requested Bay Courl <br /> FBC Courtyard <br /> Conference Spoce o1n.r Reduced5Fby55% <br /> Peer Living Spill Enhances,Some Vestibule <br /> Resource Center Squared up building archifec ure <br /> County Offices I Discharge Reduced P.rkt.g from 501.25 <br /> No llndetg—nd Stormwoter Retenllon <br /> 5 <br /> 6 <br /> 7 <br />