Browse
Search
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:01:27 PM
Creation date
11/13/2025 2:41:06 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
152 <br /> 1. Any proposed construction regulated by the NC State Building Codes will require permitting. <br /> Forestar Response: Noted. <br /> Environmental Health—Victoria Hudson (919) 245-2365 vhudson@orangecountync.gov <br /> 1. The Department has a well permit for this parcel for the purpose of assessing groundwater for <br /> the proposed community. No other applications have been received. No other public health <br /> concerns at this time. <br /> Forestar Response: Thank you. <br /> Erosion Control —Tyler Sliger (919) 245-2365 tsliger@orangecountync.gov <br /> 1. Based on the materials provided for the April 3rd DAC meeting, there are 3 mapped stream <br /> features or other surface water features (e.g. ponds and/or wetlands) within the project's parcel <br /> boundaries. Regulated streams (if any) must comply with Section 6.13 of the Orange County <br /> Unified Development Ordinance (UDO). If applicable, the applicant must also comply with <br /> Section 2.20 of the UDO and submit a Buffer Use Authorization Certificate (BAC) application for <br /> disturbances inside the regulated stream buffer. Forestar Response: Noted. Thank you. <br /> 2. Based on the information that has been provided the project area contains 100-year Floodplain. <br /> Therefore, a Floodplain Development Application for a Floodplain Development Permit (FDP) <br /> will be needed if development is proposed in the floodplain. If needed, the applicant must also <br /> comply with Section 2.6 of the UDO. Forestar Response: Noted. Thank you. <br /> 3. Based on the submitted materials, the project is proposing a stream crossing. If the project <br /> proposes a crossing and/or is disturbing the stream channel a Pre-Authorization Construction <br /> Notification (PCN) application will need to be submitted to the United States Army Corps of <br /> Engineers (USACE) for the scope of work and a USACE Jurisdictional Determination (JD) must be <br /> forwarded to Orange County staff. <br /> Forestar Response: Noted. We will do so. Thank you. <br /> 4. Based on the information provided and for the proposed/assumed limits of disturbance, the <br /> project will need a Land Disturbance Permit (LDP). If this project requires a LDP the applicant <br /> must adhere to Sections 2.18, 2.19, and 6.15 of the UDO. Orange County strongly advises the <br /> applicant to submit an LDP upfront that accounts for the total projects including the roads and <br /> lots. <br /> Forestar Response: Noted. Thank you. <br /> Fire and Life Safety—Chris Pendergrass (919) 245-6125 cpendergrass@orangecountync.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.