Browse
Search
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-18-2025 Business Meeting
>
Agenda 11-18-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:01:27 PM
Creation date
11/13/2025 2:41:06 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for November 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-18-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis <br /> Staff Analysis <br /> As required under Section 2.8.5 of the UDO, the Planning Director shall cause an analysis to be made <br /> of the application. In analyzing this request, the Planning Director offers a full analysis of the <br /> application's consistency with the adopted Orange County 2030 Comprehensive Plan. <br /> See the drafted Statement of Consistency (Attachment 7) and Statement of Inconsistency (Attachment <br /> 8) in which the relevant Goals and Objectives of the Orange County 2030 Comprehensive Land Use <br /> Plan have been analyzed in full detail. <br /> 1. Staff review determined that the application is complete and all submitted materials are in <br /> compliance with the following applicable sections of the UDO: <br /> ■ Section 2.8, Zoning Atlas and Unified Development Ordinance Amendments <br /> ■ Section 2.9, Conditional Districts <br /> ■ Section 5.21.1(A), Standards for Major Subdivisions, Conditional Districts <br /> In accordance with Section 2.9.1(F), Approval and Conditions, the applicant has submitted <br /> conditions which are to be reviewed by the Board of County Commissioners for a determination as <br /> to whether such conditions will afford protection of the public health, safety, and general welfare. <br /> "Dwelling, Single-Family" is defined as Use#42 in the Table of Permitted Uses and within Article <br /> 10, Definitions of the UDO as: <br /> "A detached building containing one dwelling unit." <br /> Section 5.2, Table of Permitted Uses of the UDO identifies "Dwelling, Single-Family" as a <br /> permitted use within the R-CD zoning district. <br /> 2. Staff review of the application included considerations for how the request relates to the Orange <br /> County 2030 Comprehensive Plan. This staff analysis found in the Statement of Consistency <br /> (Attachment 7) outlines elements of the Plan which staff identified as relevant to the consideration <br /> of this request. <br /> 3. The requested zoning district, R-CD (Residential - Conditional District), is consistent with the 2030 <br /> Comprehensive Plan, Appendix F, Relationships Between Land Use Classifications and Zoning <br /> Districts. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.