Browse
Search
OUTBoard Nov 17, 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Nov 17, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2025 6:59:39 PM
Creation date
11/11/2025 6:58:17 PM
Metadata
Fields
Template:
BOCC
Date
11/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 12/5/2030 FY2032 $10,580,000 Municipal agreement needs to be Alex Stankovic <br /> 1741/SR 1838(Old Durham Chapel Hill Road)in Chapel requested and executed to begin work. <br /> Hill <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 7/19/2033 FY2036 $77,400,000 PE funding approved 5/14/15, Planning Radha Attaluri <br /> 50235.1.1 1-40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-0305B which was <br /> 50235.3.1 formerly 1-5967. <br /> EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from 9/1/2033 FY2036 $13,980,000 Municipal agreement needs to be Alex Stankovic <br /> SR 1772 (North Greensboro Street)to south of Norfolk requested and executed to begin work. <br /> Southern Railroad Tracks in the Town of Carrboro <br /> 1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/18/2033 FY2036 $164,500,000 PE funding approved 9/8/17, Planning Colin Mellor <br /> 34142.1.5 Churton Street)in Hillsborough and Design activities underway, <br /> 34142.3.3 Coordinate with 1-0305 and U-5845. (I- <br /> 34142.3.4 0305B was formerly 1-5967) <br /> 34142.2.4 <br /> 1-0305(A) Widening of 1-85 from west of SR1006 (Orange Grove 1/1/2040 post years $132,000,000 Project not currently funded. (project I- Colin Mellor <br /> 34142.1.2 Road)in Orange Co. to west of SR 1400 (Sparger Road)in 5983 to be done under 1-0305A) <br /> 34142.2.2 Orange Co. <br /> 34142.3.2 <br /> 1-0305C Interchange improvements at 1-85 and NC 86 in 1/1/2040 post years $20,900,000 Project not currently funded. (project I- Colin Mellor <br /> 34142.1.6 Hillsborough 5984 to be done under 1-0305C) <br /> SS-6207AM Curve warning sign improvements as recommended by TBD TBD $225,000 Planning and design activities to begin Dawn McPherson <br /> HNTB through systemic curve signing investigations. soon. <br /> (Alamance, Guilford, Orange) <br /> Page 5 TWTPO November 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.