Browse
Search
11.12.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
11.12.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2025 6:03:54 PM
Creation date
11/11/2025 6:02:37 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste Date: Staff: <br />Matt Taylor <br />mtaylor@orangecountync.gov <br />919-918-4905 <br />1. <br /> Stormwater <br />Management Date: 09/12/25 Staff: <br />Christopher Sandt <br />csandt@orangecountync.gov <br />919-245-2583 <br />1. The project is located within three (3) watersheds, inclusive of the Cane Creek Protected <br />Watershed Overlay District, the University Lake Protected Watershed Overlay District, <br />and the Haw River Unprotected Watershed Overlay District. The most stringent <br />watershed protection requirements of the three watersheds will apply, where applicable. <br />The submittal of a Stormwater Management Plan (SMP) is required for any proposed <br />non-residential Land-Disturbing Activity exceeding 21,780 square feet. Please note <br />that land disturbance thresholds are cumulative to parent tract and will carry over <br />to any/all subdivided lots. <br /> <br /> Transportation <br />Services Date: Staff: <br />Nish Trivedi <br />ntrivedi@orangecountync.gov <br />919-245-2007 <br />1. <br />91
The URL can be used to link to this page
Your browser does not support the video tag.