Browse
Search
11.12.25 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2025
>
11.12.25 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2025 6:03:54 PM
Creation date
11/11/2025 6:02:37 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land Use Buffers/Setbacks <br />Per UDO Section 5.8.2(B)(2), Care Facilities shall provide a Type B, 30 ft. buffer around the facility and <br />outdoor areas in accordance with Section 6.8.6 Landscape Buffers. The buffer requirement is imposed <br />to screen the view of outdoor areas associated with the Care Facility use and reduce noise associated <br />with the facility. The property and proposed use may qualify for UDO Section 6.8.3 Variations, which <br />allows for modification to landscaping and buffer standards when existing structures, utilities, gardens <br />or active farmland are already located in what would be a required buffer area. Section 6.8.3 grants the <br />Planning Director authority to modify the buffer and landscape standards in these instances. <br />Proposed Buffers <br />North Existing wooded areas proposed to be maintained except where “proposed future <br />building site” is noted on site plan. <br />South Existing wooded areas and garden areas to be maintained, as permitted by UDO Section <br />6.8.3 Variations <br />East 30-foot buffer along Dodson Knoll Road <br />West Existing wooded areas proposed to be maintained except where “proposed future <br />building site” is noted on site plan <br />Environmental Assessment <br />The applicant has provided an Environmental Assessment (EA) application and supporting materials as <br />required in Section 6.16 of the UDO with their submittal. These materials were shared with various State <br />agencies via the NC Department of Administration’s State Clearinghouse. Planning staff and Department <br />of Environment Agriculture Park and Recreation (DEAPR) staff have jointly reviewed the materials and <br />agree with a determination of “Finding of No Significant Impact (FONSI)” as required in Section <br />2.25.1(B)(5) of the UDO. <br />Solid Waste <br />The applicant has indicated development within the project will conform to the Orange County Solid <br />Waste Management Ordinance. Solid Waste staff were included in the September 19, 2025, DAC review. <br />Ordinance Requirements <br />“Care Facility” is defined as Use #19 in the Table of Permitted Uses and within Article 10 Definitions of the <br />UDO as: <br />“Use type offering temporary care to clients, including children, adolescents, and adults, for no more <br />than eight hours in a 24-hour period. Care can be offered regardless of the time of day and whether <br />or not operated for profit. Term includes Childcare Centers, and any other Child Care arrangement <br />not excluded by General Statute 110-86(2), that provides child care. <br />a). A Child Care center is an arrangement where, at any one time, there are three or more pre- <br />school children or nine or more school-aged children receiving Child Care. <br />b). A family Child Care home is a Child Care arrangement located in a residence where, at any <br />one time, more than two children, but fewer than nine children, receive Child Care.” <br />STAFF COMMENT: In the case of this application, the applicant is seeking a special use permit <br />for the existing facility, which currently operates as a bona fide farm-related use, to receive a <br />21
The URL can be used to link to this page
Your browser does not support the video tag.