Orange County NC Website
• range County - Solar Feasibility Study Submitted by Pisgah Energy <br /> PISGAH ENERGY <br /> overall layout and heights , as well as basic information about the solar PV system such as capacity and total <br /> area of PV system , and the upward , downward , lateral reaction forces that the canopy will transfer to the <br /> parking deck . NV5 will review these details and verify that that the garage can or cannot accommodate the <br /> structural forces from the solar PV canopy. <br /> • Recommendations and design for battery-based systems for critical back- up power and/or utility savings . <br /> • Continued design -development , production of construction documents , and construction administration <br /> services after feasibility . <br /> • Design -Build Construction Services and Commissions Services . <br /> • 3 - D Modeling . <br /> • EV Charging station evaluation . <br /> Current standard billing rates are as follows : <br /> Pisgah Energy Position Title <br /> Senior Project Manager. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 196/hr. <br /> Project Manager/ Designer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . lonesome INS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 176/hr. <br /> MasterElectrician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . goggle son Mellon on . . . . . . . . . . . . . . . . .$ 1761hr. <br /> Energy Usage Analyst/ Utility Interconnection Specialist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 176/hr. <br /> Construction Manager. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ism . . . . . . . . . . . sea gas . Bases also . . . . . . . . . . . . . . . . . . . . . . . . .$ 1561hr. <br /> NV5 Position Title <br /> Vice President . . . . . . . . . . . me some me I magellasaffs lassollsols mossmasall <br /> GroupLeader. . . . . . . . . . . . . . . . . . . . INN goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200/hr. <br /> ProjectManager. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 150/hr. <br /> Project Engineer. <br /> Reimbursable Expenses as Reimbursable expenses shall be in addition to the compensation for basic and <br /> additional services and will be invoiced according to the line items below and will not exceed these values . <br /> These services include actual expenditures incurred by Pisgah Energy and NV5 . Reimbursable expenses <br /> include : <br /> Orange County Reimbursable Expenses : <br /> • Lodging expenses — Not to Exceed - $ 1 , 080 <br /> • Meal expenses — Not to Exceed - $650 <br /> • Travel expenses ( Mileage rates per current NCDOR) — Not to Exceed - $ 1 , 700 <br /> Town of Hillsborough Reimbursable Expenses : <br /> • Lodging expenses — Not to Exceed - $540 <br /> • Meal expenses — Not to Exceed - $250 <br /> • Travel expenses (Mileage rates per current NCDOR) — Not to Exceed - $ 500 <br /> iSolarProposal <br /> i <br />