Browse
Search
Minutes 10-14-2025-Joint Meeting w/Fire Department
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2025
>
Minutes 10-14-2025-Joint Meeting w/Fire Department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2025 8:01:07 AM
Creation date
11/11/2025 7:57:54 AM
Metadata
Fields
Template:
BOCC
Date
10/14/2025
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda 10-14-2025; 1 - Discussion Topics-Presentation from Orange County Chiefs’ Association
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
Agenda 10-14-2025; 2 - Orange County Land Use Plan 2050 – Board Request for Additional Information
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
Agenda 10-14-2025; 3 - Affordable Housing Advisory Board - Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
Agenda 10-14-2025; 4 - Opioid Advisory Committee – Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
Agenda 10-14-2025; 5 - Parks and Recreation Council - Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
Agenda for October 14, 2025 Joint Meeting with Chiefs' Association and Regular Work Session
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-14-2025 Joint Meeting with Orange County Chiefs Association and Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brandon Mullen (representing Chief Jeff Borland) said Cedar Grove has 32 volunteers, 5 <br /> part-time firefighters, and one full-time Chief. <br /> Slide #11 <br /> Caldwell Fire <br /> 7 <br /> Department Fla <br /> Fire Chief: Brad Allison <br /> Insurance District(ISO Rating): Caldwell (4) <br /> Accomplishments <br /> • Increase in volunteer members <br /> • Ordered new brush truck <br /> • Completed station renovations at Caldwell Station 1 <br /> • Purchased additional rope rescue equipment <br /> • Two members graduated from the ACC Fire Academy/EMT Class <br /> • Maintained insurance rating for the Caldwell fire district <br /> • Received grant to replace tires on Tankers 733 & 743 <br /> 11 <br /> Chief Brad Allison reported 42 volunteers with no paid staff currently, though he foresees <br /> adding part-time staff next year. <br /> Commissioner Portie-Ascott asked how a brush truck is different from the new engine <br /> Cedar Grove purchased. She also asked why it takes so long to get a truck. <br /> Chief Potter said there is no exact answer at this time for why there are such drastic delays <br /> and price increases. He said the state and federal government are looking into that. He shared <br /> that an engine contract signed in 2021 for about $600,000 would cost over $1 million to replace <br /> today. He deferred the Chief Allison about the brush truck. <br /> Chief Allison explained that brush trucks are smaller units for wood, fuel, and grass fires, <br /> holding 200-300 gallons of water with smaller pumps, carrying chainsaws, backpack blowers, and <br /> rakes. They cost about $70,000 compared to over $1 million for engines. He described losing a <br /> brush truck during Chantal when it dropped off a road in heavy rain, with water rising to the <br /> windows, forcing both firefighters to climb onto the truck's top. He said the replacement should <br /> arrive by the month's end. He explained that engines respond to structure fires and vehicle fires, <br /> and current wait times are three to five years for delivery of those vehicles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.