Orange County NC Website
58 <br /> It Takes a Team <br /> • After completion of drilling and <br /> testing, a distribution system engineer <br /> will need to be consulted with to <br /> design distribution, which Leads to... . • <br /> • Utility operator review o <br /> • NC DEQ final permitting after <br /> distribution design -� <br /> LU <br /> • Contractors for construction <br /> • What does this cost? What's next? <br /> AKM�- <br /> APPLIED RESOURCE MANAGEMENT.PC <br />