Orange County NC Website
48 <br /> Public SupplyWell Siting <br /> Distance ft Potential Source of Pollution• <br /> Setback requirements 100 a From any sanitary sewage disposal system,sewer,or sewer pipe unless sewer is <br /> constructed of water main materials and joints,in which the sewer pipe shall be <br /> at least 50 feet from the well. <br /> a From buildings,mobile homes,permanent structures,animal houses or lots, <br /> cultivated areas to which chemicals are applied. <br /> • From surface water. <br /> • 100' radius controlled by the . From a chemical or petroleum fuel underground storage tank with secondary <br /> containment <br /> operators of the well • From apy other potential source of pollution not listed in this table. <br /> 200 • From a subsurface sanitary sewage treatment and disposal system designed for <br /> 3,000 or more gallons of wastewater a day,unless your well water source is a <br /> confined aquifer. <br /> 300 ■ From any cemetery or burial ground. <br /> 500 - From a septage disposal site. <br /> • Requires a PG or PE to * From a chemical or petroleum fuel underground storage tank without secondary <br /> containment. <br /> • From the boundary of a ground water contamination area. <br /> submit a sealed letter to NC From a sanitary landfill or non-permitted non-hazardous solid waste disposal <br /> site. <br /> DEQ certifying due diligence 1,000 From a hazardous waste disposal site or in any location which conflicts with the <br /> North Carolina Hazardous Waste Management Rules cited as 15A WCAC 13A. <br /> regarding setbacks <br /> AKM <br /> APPLIED RESOURCE MANAGEMENT,PC <br />